My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AUSTIN-FOUST ASSOCIATES - 2008
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
A (INACTIVE)
>
AUSTIN-FOUST ASSOCIATES - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 3:25:51 PM
Creation date
8/15/2008 3:07:58 PM
Metadata
Fields
Template:
Contracts
Company Name
AUSTIN-FOUST ASSOCIATES
Contract #
A-2008-105
Agency
PLANNING & BUILDING
Council Approval Date
6/2/2008
Expiration Date
6/30/2009
Insurance Exp Date
8/15/2009
Destruction Year
2014
Notes
Amends A-2007-153
Document Relationships
AUSTIN-FAUST ASSOCIATES - 2007
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\A (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESUME <br />TERENCE W. AUSTIN, Principal <br />Education B.E. in Civil Engineering <br />B.S. in Mathematics <br />M.S. in Transportation <br />M.B.A. in Business Administration <br />Registration Traffic Engineer: CA #TR1123 <br />Experience Mr. Austin is a principal with Austin -Foust Associates, Inc. He has been <br />involved in transportation planning for over 30 years, with specific expertise in long -range planning and <br />effective integration of transportation needs and strategies into overall land use and transportation system <br />planning. <br />As part of his transportation planning work, he has carried out numerous traffic studies in support <br />of major highway improvement projects. Some examples of studies in which he has been the project <br />manager are as follows: <br />Orange County Transportation Corridors — Mr. Austin has been Project Principal for <br />numerous special studies for Orange County's tollways. The studies have included interchange <br />analyses, phasing analyses, and most recently a detailed study of the proposed extension of the <br />Foothill Transportation Corridor (SR -241) from its current termination to I -5. The work has <br />involved preparing traffic forecasts and carrying out capacity analyses for 40 land <br />use /transportation alternatives. <br />Freeway Interchange Studies - Mr. Austin has been Project Manager for numerous PSR and <br />PR traffic studies for freeway interchange projects. Examples include I- 5 /Hasley Canyon Road, <br />I- 5/Magic Mountain Parkway, I -5 /SR -126 connection (Santa Clarita Valley), 1 -5 /Crown Valley <br />Parkway, and I -5 /Ortega Highway (Orange County). <br />Riverside County to Orange County MIS. Mr. Austin was Project Manager for the Traffic <br />Analysis part of this Major Investment Study. The work involved analyzing various alternatives <br />for increasing capacity between the two counties. A major part of the work effort was analyzing <br />existing and future traffic operations for the SR -91 freeway. <br />With a proven ability to work with other professionals, Mr. Austin has participated in many <br />multi - disciplinary teams on specific engineering projects. <br />08SantaAnaS0Q.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.