My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AUSTIN-FOUST ASSOCIATES - 2008
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
A (INACTIVE)
>
AUSTIN-FOUST ASSOCIATES - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 3:25:51 PM
Creation date
8/15/2008 3:07:58 PM
Metadata
Fields
Template:
Contracts
Company Name
AUSTIN-FOUST ASSOCIATES
Contract #
A-2008-105
Agency
PLANNING & BUILDING
Council Approval Date
6/2/2008
Expiration Date
6/30/2009
Insurance Exp Date
8/15/2009
Destruction Year
2014
Notes
Amends A-2007-153
Document Relationships
AUSTIN-FAUST ASSOCIATES - 2007
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\A (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Caltrans requirements. The various programs Mr. Foust has participated in are Traffic Operations <br />Programs to Improve Capacity and Safety, Hazard Elimination and Safety, Intelligent Vehicle Systems, <br />Motorist Information Systems and Surveillance, and Pavement and Roadway Rehabilitation, among <br />others. Examples of recent Traffic Signals and Modifications are as follows: <br />• 20th and Olympic <br />• 20"' and Cloverfield <br />• 182nd and Western <br />• Stewart and Colorado <br />• 223rd and Frontage Road into the ARCO Refinery <br />• PCH12 °d Street Widening Feasibility Study <br />Computerized Traffic Flow Simulation <br />Mr. Foust has considerable knowledge and experience with computerized traffic flow simulation <br />including use of TRANSYT and SYNCHRO computer models. He routinely utilizes these models for <br />both optimization of signal timing and as an analytical tool. As Project Manager, he utilized <br />TRANSYT -7F to analyze computer runs in the performance of traffic signal Management and CORSIM <br />(coordination and surveillance) projects for several cities. <br />Traffic Studies <br />Mr. Foust has extensive experience in the preparation of traffic circulation and transportation <br />planning studies. These studies involve TSM/Transit options, parking management, residential traffic <br />control, and the integration of operational traffic engineering with regional travel modeling and <br />forecasting. Examples of recently completed studies include: <br />• East Ocean Boulevard Improvement Study, Long Beach <br />• Mission Viejo Hospital Traffic Study, Mission Viejo <br />• Gateway Redevelopment Area Traffic Study, Laguna Niguel <br />• Michelson Drive Residential Traffic Control Study, Irvine, <br />• Peninsula Center Office Parking Management Program, Rolling Hills Estates <br />• Palos Verdes Parking and Circulation Study, Rancho Palos Verdes <br />• South Coast Plaza Area Transportation Study, Joint Effort: OCTA, OCTD, City of Costa Mesa <br />and City of Santa Ana <br />• Santa Ana/Orange Neighborhood Preservation Plan, Santa Ana/Orange <br />• High Flow Arterial Concept Feasibility Study, OCTA <br />• Ocean Front Boardwalk Feasibility Study, Newport Beach <br />• University Drive Extension Deletion Study, Orange County <br />• Spring - Walnut MPAH Realignment Study, City of Orange <br />• PCH -Del Prado One -Way Couplet Study, Dana Point <br />08SantaAnaS0Q.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.