My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - LANDSCAPE SA ZOO
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
09/02/2008
>
25H - LANDSCAPE SA ZOO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:28:15 PM
Creation date
8/25/2008 2:31:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25H
Date
9/2/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Pagel8of41 <br /> <br />The contractor shall tum off irrigation systems during periods of rainfall <br />and times when suspension of irrigation is desirable to conserve water <br />while remaining within the guidelines of EW A. <br /> <br />a. When the Director acknowledges the necessity to tum on the water <br />once again, all controllers shall be activated within twenty-four (24) <br />hours. After 24 hours should the Contractor not turn irrigation <br />systems back on, the Director may, at his discretion, elect to <br />activate the controllers with City forces and deduct time plus <br />overhead from the Contractor's monthly invoice. <br /> <br />4) Inspection and Reporting <br /> <br />a. The Contractor shall physically inspect (by manual or semi- <br />automatically running the Controller) the operation of all systems <br />one (1) time per month. The Contractor shall maintain all sprinkler <br />systems in such a way as to guarantee proper coverage and full <br />working capability, and make whatever adjustments necessary to <br />prevent excessive overspray/runoff into street right-of-ways or other <br />areas not intended to receive irrigation overspray/runoff. The <br />Contractor shall repair at his own expense any irrigation head and <br />lateral line rendered inoperable or malfunction due to attrition, <br />vandalism, etc. <br /> <br />b. A visual inspection by the Contractor's Irrigation Technician of all <br />irrigated areas shall occur, more often, but not less than one (1 ) <br />time per week. All automated irrigation areas not receiving full <br />coverage shall be irrigated by a portable irrigation method. The <br />contractor shall furnish all hoses, nozzles, sprinklers, etc., <br />necessary to accomplish this supplemental irrigation. Care shall be <br />exercised to prevent a waste of water, erosion, and/or detrimental <br />seepage into existing underground improvements or structures. <br /> <br />c. Contractor shall submit an irrigation report to the Director every <br />month. The report shall be of the format required by the Director <br />and shall include, but not be limited to, controller location, type of <br />controller, number of stations, run times for each station, turf or <br />shrub irrigation and repairs made for each station and what <br />maintenance is necessary to bring an irrigation system up to full <br />capability. <br /> <br />5) Repairs <br /> <br />a. The Contractor shall be responsible for repairs to the irrigation <br />system, from irrigation head to the water meter, when there is a <br />system failure. Should the Director elect to have the Contractor <br />repair any portion of the system from the remote control valve to <br />.-. the Water meter it will be considered extra work and the City will <br /> <br />25H-32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.