My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2008-09-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
09/02/2008
>
FULL PACKET_2008-09-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:28:02 PM
Creation date
8/27/2008 12:57:54 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT NO. C-8-XXXX <br />1 CITY agrees to the following responsibilities for the PROJECT: <br />2 A. To act as the lead agency for the PROJECT and to ensure compliance with all <br />3 terms and conditions set forth in any applicable policies including, but not limited to, the <br />4 Alternatives Analysis, the National Environmental Protection Act (NEPA), and the State of <br />5 California Environmental Quality Act (CEQA), including associated detailed planning and <br />6 conceptual engineering. <br />7 B. To provide eligible local matching funds of One Hundred Thousand Dollars <br />8 ($100,000) for the PROJECT to be expended in advance of AUTHORTY reimbursement, and <br />9 to provide all the additional local funds if the total PROJECT costs exceed Six Million Dollars <br />10 ($6,000,000). <br />11 C. To act as lead agency to secure consultant services to prepare the PROJECT. <br />12 D. To be responsible for the review and oversight of all third party preparation and <br />13 submission of documents related to the PROJECT. <br />14 E. To evaluate a minimum of four alternatives for the PROJECT including a bus <br />15 ~ only system operated in a dedicated transit lane, a rail only system operated in a dedicated <br />16 transit lane, a bus only system operated in general purpose lanes and a rail system operated <br />17 in general purpose lanes consistent with AUTHORITY-approved Go Local Program criteria. <br />18 r. To obtain all required reviews, clearances, permits, licenses, and approvals from <br />19 all applicable agencies for the PROJECT. <br />20 G. To consider potential requirements imposed by the Public Utilities Commission in <br />21 PROJECT development. <br />22 H. To provide monthly updates to the AUTHORITY on status of PROJECT <br />23 development, including project overview, detailed planning, alternatives analysis, <br />24 environmental analysis, public outreach, schedule and anticipated activities for the following <br />25 month. Report must be submitted within thirty (30) days of end of month in a format approved <br />26 by the AUTHORITY. <br />Page 5 of 10 <br />25C-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.