My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T & B PLANNING 3
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
T (INACTIVE)
>
T & B PLANNING 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:36:41 PM
Creation date
8/28/2008 9:45:58 AM
Metadata
Fields
Template:
Contracts
Company Name
T & B PLANNING
Contract #
A-2008-136
Agency
PLANNING & BUILDING
Council Approval Date
6/2/2008
Expiration Date
3/12/2009
Insurance Exp Date
9/20/2009
Destruction Year
2014
Notes
Professional Liab exp 9/20/08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Areas of Expertise T&B PLANNING CONSULTANTS, INC. <br />➢ Impact analyses for numerous elements of the environment, including land use, visual quality, <br />landform alteration, agricultural and mineral resources, public safety and public facilities and <br />utilities. <br />➢ Computer -aided visual simulation of pre- and post -project conditions to assist in the analysis <br />of visual quality impacts. <br />➢ Review of environmental technical reports to ensure compliance with local jurisdiction and <br />State requirements. <br />➢ Determination of effective mitigation measures and preparation of Mitigation Monitoring and <br />Reporting Programs (MMRPs). <br />➢ Mitigation by design and evaluation and recommendation of project alternatives which <br />reduce or avoid potentially significant environmental effects and mitigation costs. <br />➢ Preparation of Findings of Fact and Statements of Overriding Consideration. <br />➢ Participation at public meetings and hearings. <br />➢ Processing assistance for state and federal resource agency permits and coordination with <br />resource agencies. <br />T&B Planning's environmental professional staff is skilled at preparing and processing CEQA <br />documents, including but not limited to, Environmental Assessments, Initial Studies, Notices of <br />Preparation, Negative Declarations, Mitigated Negative Declarations, Environmental Impact Reports <br />(EIRs), Addenda, Supplemental EIRs, and Subsequent EIRs. T&B Planning has prepared hundreds of <br />CEQA documents serving both public and private sector clients. Within the 2007 calendar year, the <br />firm provided services to clients with projects in the County of Riverside, City of Hemet, City of <br />Perris, City of Oceanside, City of San Diego, and County of San Diego. Documents have been <br />successfully completed by T&B Planning for a wide variety of projects ranging from two -lot parcel maps <br />to circulation element roadways and highways, community plans, master -planned communities, <br />mining operations, hotels and resorts, schools and universities. <br />Permit processing and assistance with state and federal resource agency permitting is also performed <br />by the firm's environmental services staff. T&B Planning's environmental staff can assist in the <br />processing of local jurisdiction and resource agency permits, such as Army Corps of Engineers 404 <br />permits, Regional Water Quality Control Board 401 permits, California Department of Fish and <br />Game 1601/1603 permits, State Coastal Development permits. <br />Our staff receives continuing education to ensure current knowledge of changes to CEQA and the <br />effect of recent case law on environmental requirements. Background and knowledge of important <br />environmental sensitivities at a state and federal level, for the region, and in the project -specific level <br />n <br />
The URL can be used to link to this page
Your browser does not support the video tag.