My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for On-Call Demolition Services for Abatement
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/15/2025
>
Item 20 - Agreements for On-Call Demolition Services for Abatement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 4:04:39 PM
Creation date
4/9/2025 3:22:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Agency
Planning & Building
Item #
20
Date
4/15/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i) Required to cap the sewer main as close to the property line as possible. Contractors shall <br />ensure that all utilities are safe and secure per the utilities' operating procedures, <br />d) Compacting to 100% density. i) The property shall be flat and free of debris at the completion <br />of the project. <br />3) Prior to submitting all on -call proposals, the Contractor shall visit the subject project site <br />(including coordinating with the City for access inside the building), or from public right of way, <br />and obtain any necessary as-builts to define an appropriate scope of work. Photographs in lieu <br />of a site visit may be acceptable for certain projects. <br />4) All work is to be done in accordance with all applicable federal, state and local regulations, <br />standards and codes governing demolition and any other trade work done in conjunction with <br />the demolition, a) The Contractor shall supply all necessary labor, materials, services, <br />insurance, permits, and equipment to carry out the work in accordance with all applicable <br />federal, state, and local regulations. <br />5) Copies of all demolition permits, water and sewer cap inspection approval and a letter of <br />completion should be submitted for City's files prior to the Contractor receiving payment. <br />6) The Contractor at all times shall keep the Project site free from accumulation of waste <br />materials or rubbish caused by the Contractor's operations. <br />7) At the completion of each trade of the work, and at final completion prior to contractor <br />submitting the final invoice, Contractor shall remove all waste materials, and rubbish from and <br />about the project as well as tools, construction equipment, machinery, and surplus materials. <br />8) Contractor shall hand deliver a City provided work notice letter to adjacent property owners at <br />least one week prior to the demolition work. <br />B. Asbestos Abatement: <br />1) The work described herein consists of removal and disposal of ALL asbestos containing <br />materials (ACM -friable or nonfriable) and subsequent cleaning of the sites in accordance with all <br />applicable federal, state and local regulations, standards and codes governing asbestos and <br />any other trade work done in conjunction with the abatement. <br />2) Results of any testing that identify asbestos containing materials will be provided by the City. <br />3) It is the responsibility of the Contractor to determine if any additional asbestos removal is <br />required in addition to the surveys. <br />4) Copies of all notifications must be submitted to City including: a) Abatement contractor's <br />license, map and/or clear documentation specifying asbestos containing materials abated, <br />b) Completed waste manifests; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.