Laserfiche WebLink
c) A completion letter indicating that all asbestos containing materials from these properties <br />have been abated and properties are ready to be demolished. <br />C. Lead Removal: <br />1) The Contractor shall take all necessary precautions and follow all Occupational Safety & <br />Health Administration (OSHA')s guidelines required in the handling of lead contained materials if <br />any are detected. a) Please refer to the Lead Hazard Evaluation Report which will be provided <br />to the Contractor prior to on -call bid. <br />D. Rat and/or Vermin Abatement <br />1) Contractor, prior to performing demolition, is responsible for providing rat and/or vermin <br />abatement. a) As part of the demolition completion package, written certification will be provided <br />to the City, stating that such work was performed, and that the structures were free of infestation <br />prior to the demolition taking place. <br />E. Erosion Control <br />1) Prior to performing work under this Agreement, Contractor shall prepare erosion and <br />sediment control plan for the approval of the Plan Check Engineer. a) The plan shall be <br />prepared per the applicable guidelines described in the latest version of the Orange County <br />Program Construction Runoff Guidance Manual <br />(http://www.ocwatersheds.com/documents/bmp/constructionactivities). <br />2) The Contractor shall submit the plans for review and shall make the necessary revisions to <br />the plans as directed by the City. <br />3) The plans shall be prepared by a Civil Engineer licensed in the State of California. a) The City <br />may waive the requirement of licensed Civil Engineer if the Contractor can satisfactorily prove to <br />the City that the person preparing the erosion control plan is qualified in the field of erosion <br />control. <br />4) The Contractor shall keep a copy of the erosion control plan on -site for the duration of the <br />contract and shall provide all necessary control devices to implement all necessary measures <br />as shown on the plan. a) The erosion control plan shall remain in effect until approval to remove <br />is granted by the City. <br />5) All erosion control materials shall be available on -site and stockpiled at a convenient location <br />to facilitate rapid construction of temporary devices when rain is eminent. <br />F. Removal of Trash and Debris <br />