Laserfiche WebLink
B. Scaffolding <br />1. All scaffolding shall utilize guardrails, mid fails, and toe boards. <br />2. No person shall be permitted to remain on scaffolding while it is being moved <br />or rolled. <br />3. Lock scaffold wheels when scaffold location is achieved. <br />4, Use'/2" mesh or equivalent if persons are to pass under scaffold. <br />5. Scaffold height shall not exceed four (4) times the base dimension. <br />6. Use only scaffold -grade lumber for planking. <br />2621 Honolulu Ave. Montrose, CA. 91020 Lic. No. 603409 DDSH No 771 <br />818-249-4932 FAX 818-2404937 <br />