Laserfiche WebLink
INTERIOR DEMOLITION, INC. HACLA <br />ASBESTOS ABATEMENT PLAN JOE 9800 GRAPE ST <br />#2138 LOS ANGELES, GA 90002 <br />4. Encapsulation of Surfaces in the Work Area. <br />a. After all equipment, ACM waste and disposal bags have been removed <br />from the work are, the work is then ready for the pre -sealant visual <br />inspection by the competent person. If the visual inspection is successful, <br />lightly mist the area with a "lock down" encapsulant. <br />b. The encapsulant is to be applied evenly over the work area with an <br />airless sprayer equipment, and should not be allowed to "pool up". <br />G. Allow the encapsulant enough time to dry, before regular demolition <br />activities. <br />A. Disposal Bags: 6-mm-thick leak -proof polyethylene bags shall be used and labeled <br />as follows: <br />First Label, to be used on all non -friable, non -hazardous asbestos waste, in <br />accordance with 8 CCR 1529 (k): <br />DANGER <br />CONTAINS ASBESTOS FIBERS <br />AVOID CREATING DUST <br />CANCER AND LUNG DISEASE HAZARD <br />Second Label, to be used on all hazardous asbestos waste in accordance with <br />NESHAPS 40 CFR part 61.152 (b)(i)(IV) for Waste Generator identification: <br />HOUSING AUTHORITY <br />2600 Wilshire Blvd <br />Los Angeles, CA 90002 <br />EPA ID # <br />ACCUMULATION START DATE <br />Third Label, to be used on all non -friable, non -hazardous asbestos waste in <br />accordance with NESHAPS 40 CFR part 61.152 (b)(i)(IV) for Waste Generator <br />Identification: <br />HOUSING AUTHORITY <br />2600 Wilshire Blvd <br />Los Angeles, CA 90002 <br />Manifest # <br />B. Containers (6 Mil Poly Bags) <br />The Contractor shall seal containers (6-mm polyethylene bags) when full. The <br />Contractor shall use double bagging procedures. Bags shall not be over -filled. <br />These tags shall be securely sealed, and the air will be evacuated to a HEPA- <br />filtered vacuum. To prevent accidental opening and leakage, the tops of the bags <br />will be tied with an aver -hand knot or by taping in a gooseneck fashion. Bags will <br />not be sealed with wire or cord. Bags will be transported to the on -site enclosed <br />trailer awaiting inspection, manifest signing, and transportation off site. <br />Page 7 of A <br />