My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for On-Call Demolition Services for Abatement
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/15/2025
>
Item 20 - Agreements for On-Call Demolition Services for Abatement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 4:04:39 PM
Creation date
4/9/2025 3:22:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Agency
Planning & Building
Item #
20
Date
4/15/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IONS OR SPECIAL CONCERNS: <br />• Community sensitivity- We propose including neighborhood awareness <br />practices such as `door -hanger' notices or direct communication prior to <br />high -impact activities. <br />• Rapid response- We are prepared to respond to urgent or emergency <br />demolition needs within 24-48 hours of notice, with field crews on standby. <br />• Coordination with utilities and City agencies: We take initiative in <br />handling disconnect verifications and clearance from utility providers to <br />avoid project delays. <br />DELIVERABLES AND IMPLEMENTATION PLAN: <br />• Pre -construction safety and regulatory compliance plan <br />• Asbestos/lead abatement completion documents and third -party clearance <br />reports <br />• Daily safety logs and job progress reports <br />• Disposal manifests and recycling summaries <br />• Site photos before, during, and after demolition <br />• Project close-out package with all supporting documentation <br />Implementation Timeline: <br />• Day 0-5: Permitting, notifications, utility disconnection coordination <br />• Day 6-25: Asbestos/lead abatement, third -party testing and clearance <br />• Day 26-35: Demolition, salvage, material segregation and recycling <br />• Day 36-45: Final grading, erosion control, and site cleanup <br />Note: Timeline may vary depending on site -specific conditions and scope. <br />Assumptions and Exclusions: <br />• No exclusions are assumed. Scope includes complete demolition, abatement, <br />disposal, and restoration services as requested. <br />• Unforeseen conditions such as underground storage tanks, soil <br />contamination, or structural anomalies will be promptly reported and managed <br />per City direction. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.