My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY OF - 2008
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF
>
ORANGE, COUNTY OF - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:31:46 PM
Creation date
9/15/2008 2:58:22 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY OF
Contract #
N-2008-110
Agency
FIRE
Expiration Date
6/30/2012
Insurance Exp Date
9/14/2008
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ATIACHMENT F <br />ACCEPTANCE AND TESTING PROCEDURES <br /> <br />1. Testillg <br /> <br />As part ofContraclor's service project deliverables for rollout, Contractor shall provide the County with a <br />System Test Plan which includes a Module Test, and Integration Test, and Stress Test, and a Regression Test. <br />Contractor's System Test Plan shall include but not be limited to the following: <br /> <br />a. Introduction; <br />b. Assumptions; <br />c. System Test Plan; <br />d. System Test Objectives; <br />e. System Test Acceptance Criteria; <br />f. System Test Schedule; <br />g. Responsibilities; <br />h. Resource Requirements; <br />i. Procedures; <br />j. Test Cases; <br />k. Performance Tests; <br />I. Disaster Recovery Tests. <br /> <br />Many of the Tests listed above are part of Contractor's regular testing process. Contractor's service is tested <br />through daily use. Additionally, Contractor will expand the listing above into a comprehensive System Test <br />Plan for the County's approval. <br /> <br />Contractor shall perform the requisite system tests as required by the County in Contractor's existent testing <br />environment or other appropriate environment as governed by the System Test Plan for component and <br />functionality testing for County sign-off. <br /> <br />Contractor shall provide the County with reporting of documented results of each System Test conducted and <br />certifY successful testing results as required. <br /> <br />1. Acceptnce <br />Contractor will provide the required User Acceptance Test Results Report within one week of tests as <br />required. Contractor shall include all County required elements in the plan, such as purpose, scripts, <br />objectives, roles, and problem resolution. A high level Test & Acceptance Results Report format that <br />Contractor has found successful previously is listed below. This format will be customized to meet the <br />specific needs of the County. <br /> <br />Test alld AcceptaDce Results Report <br />a. Scope & Plan Overview <br />b. Testing Approach <br />c. Test Schedule (fest 10#, name, description, time and date of execution) <br />d. Description of SetUp Procedures <br />e. Description of Action Procedure <br />f. Description of System Results <br />g. Description of Expected Results <br />h. Description of Actual Results <br />i. Variance Reporting <br />j. Resource Requirements for Resolution <br />k. Corrective Action <br />I. Summary of Results (with Signature/sign-offline) <br />m. Conclusion <br /> <br />c........ NI 000009880 <br /> <br />38 <br /> <br />3/25/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.