Laserfiche WebLink
City of Santa Ana On -Call Civil Engineering, Architectural & Landscaping Design Services <br />4. SUBCONSULTANTS <br />The DMJM Harris team includes <br />three primary subconsultants to <br />assist in performing geotechnicai, <br />surveying and landscaping services <br />as required for specific assignments <br />�e <br />Leighton Consulting, Inc. <br />17781 Cowan, Suite 200 <br />Irvine, CA 92614 <br />(949) 250-1421 <br />Coast Surveying, Inc. <br />15031 Parkway Loop, Suite B <br />Tustin, CA 92780-6527 <br />(714) 918-6266 <br />EDAW <br />1420 Kettner Boulevard, Suite 500 <br />San Diego, CA 92101 <br />(619) 233-1454 <br />Detailed resumes of individuals from <br />these firms are included in Section 3 <br />Staffing. <br />DMJM Harris will also hire specialty <br />subconsultants as the task specific <br />needs arise, as we have willingly <br />demonstrated on past task orders <br />for the City of Santa Ana. The <br />following task orders required <br />either a specialty subconsultant or <br />the work was performed primarily <br />by a subconsultant under the <br />management of DMJM Harris. <br />Civic Center Fountain Restoration: <br />An industry -leading fountain design <br />firm was retained to develop <br />conceptual and final plans for the <br />restoration of four fountains within <br />the Civic Center Plaza. <br />Pepper Tree Planter: The planter <br />outside the Ross Annex of City Hall <br />was completely refurbished with <br />lightweight soils, new irrigation and <br />planting. <br />Thornton Park Facilities: DMJM <br />Harris hired a local architect that <br />had previously assisted the City <br />for Improvements at this park as a <br />cost-effective measure to prepare <br />the plans for a castle-themed <br />administration and restroom facility. <br />Memory Lane Mitigation: DMJM <br />Harris hired an environmental firm <br />and landscape contractor to prepare <br />the soils and plant native materials <br />as a mitigation measure for the <br />completed Memory Lane bridge <br />widening project. Efforts included <br />coordination with the Corps of <br />Engineers and Department of Fish <br />and Game. <br />Supporting City In -House <br />Design Efforts: To provide the <br />necessary support to the City staff <br />in their design efforts, DMJM Harris <br />managed subconsultant efforts to <br />provide the following: <br />• Field Survey in the Park <br />Santiago neighborhood <br />• Geotechnical investigations <br />for the storm drain design on <br />Westminster and Segerstrom <br />Potholing of existing utilities <br />for the storm drain on <br />Westminster. as well as the <br />existing foundations for the <br />construction of the art wall at <br />the Transportation Center. <br />0 <br />EMEE223�� <br />