Laserfiche WebLink
A- PROJECT UNDF—K5TANDING <br />1.General: <br />PENCO Engineering, Inc. understands that the work, in general, may consist of civil engineering, architecture, landscape <br />architecture, traffic engineering, survey mapping, construction engineering support, construction staking, construction <br />inspection, geotechnical services and structural engineering services. These services are on a as needed basis and will be <br />applied to various Public Works projects such as arterial and local streets, public parks, stadiums and others. Specific work <br />may be include street repair and overlay of asphalt concrete and/or PCC streets, signing and striping, neighborhood traffic <br />studies, signal modifications, landscape and irrigation, as well as irrigation and some architectural and structural design and <br />modifications. PENCO Engineering, Inc. is confident that with our experience and our proposed team we can and will meet <br />the City of Santa Ana's requirements set forth in the proposal. <br />2. Proposed jcom. <br />PENCO Engineering, Inc. herewith assures the City of Santa Ana that we will comply with all requirements set forth in the <br />scope of services, specifically related to the use of Microstation V8 CADD, City design standards, specifications and <br />submittals. We will prepare a detailed project Scope of Work required for selected projects similar to the one included in <br />sample projects "Attachment A" of this proposal. Prior to preparing the Scope of Work for a selected project we will discuss <br />in detail, with the City of Santa Ana project staff, project requirements, specific goals, technical and non-technical, so that we <br />may prepare an accurate project scope and schedule to meet all of the project needs. We will work very closely with the City <br />of Santa Ana staff to establish the project scope that is complete and inclusive of all technical and project management <br />requirements. <br />E)• PROJI=CTAPPROACH <br />Project Management: <br />PENCO Engineering, Inc. project management includes overall project cost; schedule, quality control and monitoring efforts <br />will extend from receipt of the Notice to Proceed through completion of the Construction Documents. PENCO Engineering, <br />Inc.'s team will establish a formal and mutually acceptable Microsoft Office Project Schedule with the City of Santa Ana, <br />which will detail the critical tasks and pin point critical dates for the beginning and ending of the critical tasks. PENCO <br />Engineering, Inc.'s Project Manager will review and track the project progress, advising the City of Santa Ana at a minimum <br />of once a month of progress and updated schedules, as well as track the coordination with the City, utilities and other <br />affected agencies. The project schedule will be reviewed and approved by the City of Santa Ana prior to the start of work. <br />2. Preliminary Me� <br />PENCO Engineering, Inc.'s initial task on any assignment will be to become familiar with the existing site conditions and to <br />review available existing data as required for the assignment. A kick-off meeting with the City of Santa Ana will be <br />conducted to fully understand the City's needs and objectives for the project. This meeting will also allow PENCO <br />Engineering, Inc.'s team and the City to establish project schedule points of contact, establish administrative procedures, <br />finalize design parameters, discuss existing site conditions, receive all available records related to the project as well as <br />exchange City standards. We will adhere to City CADD Standards, including Microstation V8 CADD format. This meeting <br />is important in establishing the structure for PENCO Engineering, Inc.'s team to work with the City as an extension of their <br />project staff, to establish final product delivered to the City and the project schedule. <br />3. Quality Assurance/ Quality Control: <br />The Project Team is committed to providing the City of Santa Ana with the best possible product, on schedule and within <br />budget. To accomplish this, the Team has a Quality Assurance/Quality Control (QA/QC) Program that is organized in a <br />manner that will accommodate the specific needs and requirements of the Project. PENCO Engineering, Inc.'s QA/QC <br />program is generally divided into two phases: <br />0 <br />