My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS CORPORATION AMERICAS 7a
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
URS CORPORATION AMERICAS 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:52:58 PM
Creation date
9/22/2008 2:01:48 PM
Metadata
Fields
Template:
Contracts
Company Name
URS CORPORATION AMERICAS
Contract #
A-2008-141
Agency
PLANNING & BUILDING
Council Approval Date
6/2/2008
Expiration Date
6/30/2009
Insurance Exp Date
5/1/2009
Destruction Year
2018
Notes
Amends A-2007-169 Amended by A-2008-141-001, -002, -03
Document Relationships
URS CORPORATION 7 (2)
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
URS CORPORATION AMERICAS 7b
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
URS CORPORATION AMERICAS 7c
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
URS CORPORATION AMERICAS 7d
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.0 FEE SCHEDULE <br />URS <br />2008 Schedule of Fees and Charges <br />The following describes the basis for compensation for service <br />performed durina the fiscal vear 2008. <br />This Schedule of Fees and Charges will be adjusted <br />annually on January 1 of each subsequent year to <br />reflect merit and economic salary increases, and <br />changes in the expected level and mode of operations <br />for the new year: The new Schedule of Fees and <br />Charges will apply to existing and new assignments. <br />PERSONNEL CHARGES <br />The charge for all time required in the performance of <br />the Scope of Service, including office, field and travel <br />time, will be at the Unit Price Hourly rates set forth <br />below for the labor classifications indicated. <br />Labor Classification -Professional Staff Hourly <br />Rate <br />Graduate Engineer, Geologist, Scientist, Architect <br />$115 <br />Engineer, Geologist, Scientist, Architect <br />$125 <br />Senior Engineer, Geologist, Scientist, Architect` <br />$140 <br />Project Manager <br />$175 <br />Project Engineer, Geologist, Scientist, Architect <br />$180 <br />Senior Project Manager <br />$195 <br />Principal Engineer, Geologist, Scientist, Architect <br />$235 <br />Project Director <br />$295 <br />Office Technicians Hourly <br />Rate <br />Drafter/Illustrator <br />$ 85 <br />Senior Drafter/Illustrator <br />$100 <br />Designer <br />$105 <br />Senior Designer <br />$110 <br />Lead Designer <br />$120 <br />Field Technicians Hourly <br />Rate <br />Environmental Technician <br />$95 <br />Senior Technician <br />$105 <br />Senior Project Technician <br />$115 <br />Project Superintendent <br />$125 <br />Project Administrators Hourly <br />Rate <br />Clerical <br />$65 <br />Project Assistant <br />$80 <br />Project Administrator <br />$95 <br />Senior Project Administrator <br />$100 <br />Principal Project Administrator <br />$115 <br />Overtime (hours worked in excess of eight (8) hours <br />per day) by exempt personnel will be charged at the <br />above straight time rate. Overtime by non-exempt <br />personnel will be charged at 1.3 times the above <br />hourly rates. <br />When URS staff, appear as expert witnesses at court <br />trials, mediation, arbitration hearings and depositions, <br />their time will be charged at 2.0 times the standard <br />rate. All time spent preparing for such trials, hearings <br />and depositions will be charged at the standard labor <br />rate. <br />LABORATORY SERVICES & EOUIPMENT <br />CHARGES <br />Charges for laboratory services and equipment will be <br />charged at standard usage rates. Rate schedules are <br />available upon request. <br />OTHER PROJECT CHARGES <br />Subcontractors and Equipment Rental <br />The cost of services subcontracted by URS to others <br />and other costs incurred by URS will be charged at <br />cost plus 15%. <br />Communications <br />The cost of communications including telephone, <br />pagers, cell phones, network communications, <br />facsimile, routine postage and incidental copying <br />costs will be charged a flat rate of 4% of total gross <br />labor charges. <br />Com puters <br />The charge for use of in-house computers for <br />spreadsheets, word processing, and other similar <br />functions is $15.00 per hour. The charge for use of <br />Computer Aided Design and Drafting (CADD), <br />Graphics generation, Geographic Information <br />Systems (GIS) modeling applications, and similar <br />technical computing is $30.00 per hour. There will be <br />a charge of $7.00 for each non -color and $20.00 for <br />each color plot generated by CADD and GIS systems. <br />Document Reproduction <br />In-house reproduction will be charged at $.10 a page <br />for black and white and $1.50 a page for color. <br />Vehicles and Mileage <br />Leased field vehicles (pick-ups, vans, trucks, etc.) <br />used on project assignments will be charged at $85.00 <br />per day. The mileage charge for personal autos will <br />be the current mileage rate established by the Internal <br />Revenue Service. <br />This fee schedule contains confidential business information and is not to be copied or distributed for any <br />purpose other than the use intended in this contract or proposal. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.