My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PBS&J 2A - 2008
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
PBS&J 2A - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2016 1:12:38 PM
Creation date
10/3/2008 4:47:16 PM
Metadata
Fields
Template:
Contracts
Company Name
PBS&J
Contract #
A-2007-185-01
Agency
PUBLIC WORKS
Expiration Date
1/1/2001
Insurance Exp Date
4/1/2013
Destruction Year
2020
Notes
Amends A-2007-185 Amended by A-2010-005
Document Relationships
PBS&J 2 - 2007
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PBS&J 2B - 2010
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A -1 <br />AUTHORIZATION FOR ADDITIONAL WORK <br />September 10, 2008 <br />Mr Keyvan Pirbazari, PE <br />PBS &J <br />625 The City Drive South, Suite 200 <br />Orange, CA 92868 <br />Subject: SR -55 /MacArthur Boulevard Interchange Ramp Widening Project Traffic <br />Assessment— Contract Amendment #1 <br />Dear Mr. Pirbazari: <br />Urban Crossroads, Inc. is providing this proposal agreement to PBS & J (Client) for <br />approval of the additional work necessary to update the SR -55 /MacArthur Boulevard <br />Interchange Ramp Widening Project (EA O1-12900). The purpose of this work effort is to <br />revise the Traffic Impact Analysis based on comments provided by Caltrans on June 17, <br />2008 and provide additional detail on the expanded work efforts performed by Urban <br />Crossroads in support of the project. <br />The following scope of work describes the extra tasks that have already been completed <br />as well as the additional work effort needed to revise the traffic study to satisfy Caltrans <br />comments dated June 17, 2008. <br />The proposed additional cost includes only those tasks that are required to update the <br />traffic impact analysis and does not take into account any earlier work efforts that were <br />performed at the expense of Urban Crossroads for the benefit of the project. <br />SCOPE OF ADDITIONAL WORK <br />The following scope of work represents the additional services necessary to complete <br />this project: <br />Task 1: Field Survey of Existing Transportation Facilities $0 <br />Original Scope: Conduct a field survey of the existing transportation facilities within the <br />study area. Identify existing roadway segment geometry and lane configurations, <br />including lane widths, turn pocket storage lengths, traffic signal timing, and traffic signal <br />phasing, for the existing surface street intersections. <br />Based on the Request for Proposal, it is assumed that the traffic analysis will only <br />include the interchange of SR -55 /MacArthur Boulevard, and not the two adjacent <br />interchanges. It is also assumed that only two scenarios, the "build" and "no build" <br />conditions, will be analyzed. <br />Work Performed: Task 1 is completed, and the work performed is within the original <br />scope of work. <br />Additional Scope: No additional scope <br />
The URL can be used to link to this page
Your browser does not support the video tag.