Laserfiche WebLink
Tierra De Las <br />Pampas Exhibit <br />November 17, 2008 <br />Page 2 <br />NAME OF BIDDER <br />7,. Tek-up Construction, Inc. <br />2. Patscheck Construction <br />3. Horizons Construction Co. <br />4. C S. Legacy Construction <br />5. Zusser Company, Inc. <br />6. Hondo Company <br />7. Thomco Construction <br />8. Unique Performance <br />9. Fleming Environmental <br />l0.JRH Construction <br />11.Caltec Corporation <br />12. Faris Construction <br />13. Alma Construction <br />14.Y & M Construction <br />15. Newman Midland Corp. <br />CITY <br />Woodland Hills <br />Costa Mesa <br />Anaheim <br />Chino <br />Los Angeles <br />Santa Ana <br />Anaheim <br />Costa Mesa <br />Buena Park <br />Tustin <br />Westminster <br />Dana Point <br />Colton <br />Gardena <br />Los Alamitos <br />Base Bid Base Bid Plus <br />Plus Alternates <br />Alternate One, Two, and <br />One Three <br />$589,950.00 <br />$665,820.00 <br />$677,410.17 <br />$708,615.00 <br />$820,000.00 <br />$787,022.00 <br />$778,500.00 <br />$s6l,oo0.00 <br />$880,000.00 <br />$847,487.00 <br />$904,422.00 <br />$898,000.00 <br />$1,040,539.00 <br />$1,030,010.00 <br />$1,006,007.00 <br />$546,700.00 <br />$615,820.00 <br />$646,592.17 <br />$647,615.00 <br />$670,000.00 <br />$735,422.00 <br />$748,300.00 <br />$760,000.00 <br />$815,000.00 <br />$819,143.00 <br />$831,422.00 <br />$838,000.00 <br />$927,839.00 <br />$961,660.00 <br />$971,167.00 <br />A total of 15 bids were received and all were responsive. The lowest <br />total base bid, plus alternates one, two, and three was submitted by Tek- <br />up Construction for $589,950 which is below the Engineer's estimate of <br />$750,000. The amounts in the column of base bid plus alternates one, two, <br />and three appear to be out of order because bidding documents require <br />that the lowest responsible bidder be selected based on the lowest total <br />base bid plus alternate one and those are the amounts that staff used to <br />make the comparison. <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act the proposed <br />project has been determined to be adequately evaluated in previously <br />prepared negative Declaration No. 2002-304. <br />FISCAL IMPACT <br />The funding analysis shows a total estimated construction cost of <br />$815,488 for the project (Exhibit 2). Funds are available in the Land <br />and Water Conservation Account (account no. 156-247-6631), California <br />23B-2 <br />