Tierra De Las
<br />Pampas Exhibit
<br />November 17, 2008
<br />Page 2
<br />NAME OF BIDDER
<br />7,. Tek-up Construction, Inc.
<br />2. Patscheck Construction
<br />3. Horizons Construction Co.
<br />4. C S. Legacy Construction
<br />5. Zusser Company, Inc.
<br />6. Hondo Company
<br />7. Thomco Construction
<br />8. Unique Performance
<br />9. Fleming Environmental
<br />l0.JRH Construction
<br />11.Caltec Corporation
<br />12. Faris Construction
<br />13. Alma Construction
<br />14.Y & M Construction
<br />15. Newman Midland Corp.
<br />CITY
<br />Woodland Hills
<br />Costa Mesa
<br />Anaheim
<br />Chino
<br />Los Angeles
<br />Santa Ana
<br />Anaheim
<br />Costa Mesa
<br />Buena Park
<br />Tustin
<br />Westminster
<br />Dana Point
<br />Colton
<br />Gardena
<br />Los Alamitos
<br />Base Bid Base Bid Plus
<br />Plus Alternates
<br />Alternate One, Two, and
<br />One Three
<br />$589,950.00
<br />$665,820.00
<br />$677,410.17
<br />$708,615.00
<br />$820,000.00
<br />$787,022.00
<br />$778,500.00
<br />$s6l,oo0.00
<br />$880,000.00
<br />$847,487.00
<br />$904,422.00
<br />$898,000.00
<br />$1,040,539.00
<br />$1,030,010.00
<br />$1,006,007.00
<br />$546,700.00
<br />$615,820.00
<br />$646,592.17
<br />$647,615.00
<br />$670,000.00
<br />$735,422.00
<br />$748,300.00
<br />$760,000.00
<br />$815,000.00
<br />$819,143.00
<br />$831,422.00
<br />$838,000.00
<br />$927,839.00
<br />$961,660.00
<br />$971,167.00
<br />A total of 15 bids were received and all were responsive. The lowest
<br />total base bid, plus alternates one, two, and three was submitted by Tek-
<br />up Construction for $589,950 which is below the Engineer's estimate of
<br />$750,000. The amounts in the column of base bid plus alternates one, two,
<br />and three appear to be out of order because bidding documents require
<br />that the lowest responsible bidder be selected based on the lowest total
<br />base bid plus alternate one and those are the amounts that staff used to
<br />make the comparison.
<br />ENVIRONMENTAL IMPACT
<br />In accordance with the California Environmental Quality Act the proposed
<br />project has been determined to be adequately evaluated in previously
<br />prepared negative Declaration No. 2002-304.
<br />FISCAL IMPACT
<br />The funding analysis shows a total estimated construction cost of
<br />$815,488 for the project (Exhibit 2). Funds are available in the Land
<br />and Water Conservation Account (account no. 156-247-6631), California
<br />23B-2