Laserfiche WebLink
C. Miscellaneous Street Improvements: <br />1. Install new curb. <br />2. Remove existing and install new raised Median Island including <br />finish. <br />3 contrlol devices) ncluding signingastriping pavelme'nglergends <br />and curb painting. <br />D. Railroad Improvements: <br />1. Install Grade Crossing Improvements. <br />2. Install Signal Improvements and Active Warning Devices <br />E. Traffic signal Improvements: <br />1. Install new southbound queue cutter signal. <br />2. Signalization of Lyon Street / Normandie. <br />3. Install northbound Pre-signal. <br />17~h Street - <br />A. General Notes: <br />1. Verify existing condition and location of utilities. <br />2. Verify existing ROW and related encroachments. <br />3. Obtain necessary construction permits. <br />4. Complete Mobilization, Demobilization and Traffic Control. <br />5. Protect existing utilities. <br />B. Pedestrian Treatments: <br />1. Install swing gate(s) and railing. <br />2. Install automatic pedestrian gate(s). <br />3. Install Pedestrian truncated domes. <br />4. Compliance with ADA requirements. <br />C. Miscellaneous Street Improvements: <br />1. Install new curb. <br />2. Remove existing and install new raised Median Island including <br />finish. <br />3 contrlolndevi eslincluding siyningastrip ng pavemeln9lergends <br />and curb painting. <br />D. Railroad Improvements: <br />1. Install Concrete Crossing Panel associated with pedestrian <br />crossing improvements. <br />2. Install Grade Crossing Improvements. <br />3. Install Signal Improvements and Active Warning Devices <br />E. Traffic signal Improvements. <br />1. Install new westbound Pre-signal. <br />