Laserfiche WebLink
Santa Ana Boulevard - <br />A. General Notes: <br />1. Verify existing condition and location of utilities. <br />2. Verify existing ROW and related encroachments. <br />3. Obtain necessary construction permits. <br />4. Complete Mobilization, Demobilization and Traffic Control. <br />5. Protect existing utilities. <br />B. Pedestrian Treatments: <br />1. Install swing gate(s) and railing. <br />2. Install automatic pedestrian gate(s). <br />3. Install Pedestrian truncated domes. <br />4. Compliance with ADA requirements. <br />C. Miscellaneous Street Improvements: <br />1. Install railing and match to existing station railing. <br />2. Install decorative railing. <br />3. Install concrete sidewalk. <br />4. Install 4" diameter crushed rock infill. <br />5. Install AC pavement. <br />6. Install reinforced concrete block wall and chain link fence. <br />7. Install new curb. <br />8. Install tiled pavement, match existing. <br />9. Install edge of platform. <br />10. Protect in place billboard foundation. <br />11. Protect in place communication utility box. <br />12. Protect in place signal house. <br />13. Install direct burial signal cable. <br />14. Remove existing AC pavement. <br />15. Remove existing railing. <br />16. Remove concrete curb. <br />17. Remove existing fence. <br />18. Remove existing ramp. <br />19. Install new, maintain existing, and remove conflicting traffic <br />control devices including signing, striping, pavement legends <br />and curb painting. <br />D. Railroad Improvements: <br />1. Install Concrete Crossing Panel <br />2. Install Grade Crossing Improvements. <br />3. Install Signal Improvements and Active Warning Devices <br />E. Traffic signal Improvements <br />1. None. <br />F. Station <br />1. Remove existing platform -east side only <br />Ritchey Street - <br />