My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23I - FOUNTAIN NO 1 REHAB
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
01/05/2009
>
23I - FOUNTAIN NO 1 REHAB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:25:00 PM
Creation date
12/24/2008 3:48:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23I
Date
1/5/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PACE <br />A,dcronc~d Wrxter Eirginerring <br />EXHIBIT A-1 <br />AUTHORIZATION FOR CHANGE ORDER <br />TO: City of Santa Ana <br />Public Works Agency <br />20 Civic Center Plaza, MS M36 <br />PO Box 1988 <br />Santa Ana, CA 92702 <br />ATTN: <br />DATE: <br />PROJECT: <br />PROJECT NUMBER: <br />C.O. AUTHORIZATION #: <br />Description of Services: <br />Fees: <br />Task 00 -Reimbursables/Expenses fTBE) $ 500 <br />(To include all blueprinting, shipping, travel, reproduction, and other miscellaneous direct project <br />expenses. Reimbursables are invoiced separately at cost plus 10%.) <br />Task 06 - Fountain #1 Assessment $ 4,000 <br />Renovation of Fountain #1 will include management and administration of the Fountain #1 Renovation. <br />PACE will provide an assessment report to determine the existing conditions of Fountain #1 equipment <br />and fittings to include the following: <br />• Waterproofing <br />• Nozzles <br />• Piping <br />• Chemistry control & delivery <br />• Pump <br />• Filtration <br />• Materials <br />• Lighting <br />This report will help the City of Santa Ana to determine the necessary areas of the fountain that need <br />repair or replacement. <br />Task 07 -Fountain #1 Construction Documents $ 16,900 <br />Fountain #1 Construction Documents will incorporate the City of Santa Ana's decision for the final <br />renovation design. The plans will include: <br />• Demolition plan <br />• Fountain details and sections <br />• Utility coordination <br />• Piping Schematics <br />• Electrical requirements <br />• Specifications <br />• Chemical treatment <br />PACE will provide electronic files in both ACAD and Micro-station format. <br />231-6 <br />Kenny Nguyen <br />November 5, 2008 <br />Renovation of Fountains <br />9076E <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.