Laserfiche WebLink
Mr. Kenny Nguyen November 5, 2008 <br />City of Santa Ana /Renovation of Fountains /#9076 Page 2 of 2 <br />Task 08 -Bid Services and Services During Construction $5,800 <br />Provide owner with a list of potential contractors, prepare bid form and quantity take-off to be included <br />with overall project bid package. Attend pre-bid and construction meetings with contractors. Provide <br />clarification, revisions and addenda, as needed to the water feature construction documents to respond to <br />bidders requests and to assist issuance and negotiation of final pricing and contractor selection. Review <br />shop-drawing submittals from contractors of products and materials for conformance to construction <br />documents. At the conclusion of the construction document phase, consultant to (1) assist in reviewing <br />bids to determine the most qualified contractor at the most reasonable cost, (2) attend pre-construction <br />meeting to kick off the start of construction appropriately and answer any questions or issues early on in <br />the process, (3) review shop drawing submittals by the chosen contractor for conformance with the <br />construction document, (4) clarify construction documents if required, (5) assist in the issuance and <br />negotiation of pricing of change orders, (6) conduct necessary site visits as required during construction <br />for review of construction progress, (7) conduct a final on-site review of construction and provide a <br />completion punch list report. Punch list to be created only once. Owner is responsible for follow through <br />of items on the punch list, (8) review completeness of contractor's final as-built drawings. Water feature <br />construction requires oversight by the engineer due to the specialized nature of the work. This item is not <br />optional and is required for the contract. <br />Amount of Compensation: <br />This Request -Change Order #01: <br />f <br />Estimated 6 : ~-'`°A "~ <br />Y November 5. 2008 <br />Sonn~b. m, P. Date <br />AGREED TO AND ACCEPTED BY: <br />By <br />City of Santa Ana -Public Works Dept Date <br />~..».~, <br />PACE <br />231-7 <br />