My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-01-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
01/05/2009
>
FULL PACKET_2009-01-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:24:56 PM
Creation date
12/31/2008 11:00:40 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/5/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />JANUARY 5, 2009 <br />TITLE: <br />CONTRACT AWARD FOR ARTESIA <br />PII,AR NEIGHBORHOOD (PROJECT <br />NOS. 09-7705 AND 09-1757-C) <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a <br />bidder, <br />in the <br />Artesia <br />contract to Excel Paving Company, <br />in accordance with unit bid prices <br />estimated amount of $2,165,697.50 <br />Pilar Neighborhood Improvements. <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on 15t Reading <br />^ Ordinance on 2"d Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For <br />the lowest responsible <br />and add-on alternate one <br />for construction of the <br />2. Approve a Funding Analysis with a total estimated construction cost <br />of $2,824,800. <br />DISCUSSION <br />This project is part of the City's $100 million investment to rebuild <br />neighborhood streets throughout the City. Segments of local streets <br />located within the Artesia Pilar Neighborhood have been identified as a <br />high priority for rehabilitation in the City's pavement management <br />system (Exhibit 1}. The pavement is deteriorating due to weather, age <br />and heavy usage. Some of the adjacent curbs, gutters, sidewalks, cross <br />gutters and wheelchair ramps are also in various states of disrepair and <br />require replacement. <br />The project provides for recycling of existing asphalt pavement with the <br />cold-in-place process, construction of asphalt concrete overlay, <br />construction of cement treated base, and replacement of damaged concrete <br />curbs, gutters, sidewalks, and curb ramps. Bid alternate one provides <br />for re-establishing the survey monuments. Once completed, these <br />improvements will enhance the ride quality, surface drainage and visual <br />appearance of the neighborhood. <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />23A-1 <br />:~ RECOMMENDED ACTION <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.