My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LABELLE-MARVIN 1B - 2008
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
LABELLE-MARVIN 1B - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2017 2:54:23 PM
Creation date
2/5/2009 5:40:31 PM
Metadata
Fields
Template:
Contracts
Company Name
LABELLE-MARVIN
Contract #
A-2008-302
Agency
PLANNING & BUILDING
Council Approval Date
11/17/2008
Insurance Exp Date
6/16/2016
Destruction Year
2021
Notes
Amends A-2004-154, -01
Document Relationships
LABELLE-MARVIN 1 - 2004
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
LABELLE-MARVIN 1A - 2005
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Portland cement concrete laver(s) if any, and aggregate base <br />laver, if all-*. <br />• Borings will be extended extend to a maximum four (4') foot <br />depth from the surface to obtain bulk samples of the underlying <br />subgrade soils. <br />• Bulk subgrade soil samples will be placed in plastic bags, scaled, <br />and transported to our laboratory for further analysis. <br />• LaBelle Marvin, Inc., shall provide traffic control adequate to <br />protect the traveling public and work force., consistent with the <br />Encroachment Permit requirements. <br />• All sample locations will be backfilled and patched in accordance <br />with Encroachment Permit requirements prior to leaving the site. <br />laboratory <br />v Testing <br />Bulk subgrade soil samples will be visualIN classified and the in- <br />situ moisture content determined upon receipt in the laboratory. <br />• Representative subgrade sample(s) will be selected and tested for <br />R-Valuc strength and aid in defining the most probable long tern) <br />moisture conditions following construction. <br />En-ineerim, Ser -vices <br />• Perform site reconnaissance, <br />* compare field conditions with measured pavement strengths <br />determined during deflection testing. <br />* compare field conditions with thickness data obtained <br />during core sampling, <br />* compare field conditions with compone.ill analysis based of) <br />laboratory subgrade strength testing. <br />• Data developed during R -value testing will be utilized to project <br />probable Field support conditions during construction and <br />highlight where appropriate special care may be required during; <br />roadway preparation. <br />• Evaluation of the present pavement thicknesses utilizing <br />component analysis with H -value strength data will he combined <br />L -11W, * AMUIrVill <br />
The URL can be used to link to this page
Your browser does not support the video tag.