My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) (2) - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) (2) - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:46:55 PM
Creation date
2/11/2009 11:37:03 AM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE)
Contract #
A-2009-010
Agency
Public Works
Council Approval Date
1/5/2009
Insurance Exp Date
5/1/2011
Destruction Year
2022
Notes
UC. Auto exp. 11/01/11 Amends A-2008-085
Document Relationships
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-1 <br />PACE <br />Adunnoed Wader Freglneertn4 <br />AUTHORIZATION FOR CHANGE ORDER <br />TO: City of Santa Ana ATTN: <br />Kenny Nguyen <br />Public Works Agency DATE: <br />November 5, 2008 <br />20 Civic Center Plaza, MS M36 PROJECT: <br />Renovation of Fountains <br />PO Box 1988 PROJECT NUMBER: <br />9076E <br />Santa Ana, CA 92702 C.O. AUTHORIZATION #: <br />1 <br />Description of Services: <br />Fees: <br />Task 00 — Reim bu rsab les/Expenses (T&E) <br />$ 500 <br />(To include all blueprinting, shipping, travel, reproduction, and other miscellaneous <br />direct project <br />expenses. Reimbursables are invoiced separately at cost plus 10%) <br />Task 06 — Fountain #1 Assessment <br />$ 4,000 <br />Renovation of Fountain #1 will include management and administration of the Fountain #1 Renovation. <br />PACE will provide an assessment report to determine the existing conditions of Fountain #1 equipment <br />and fittings to include the following: <br />• Waterproofing <br />• Nozzles <br />• Piping <br />• Chemistry control & delivery <br />• Pump <br />• Filtration <br />• Materials <br />• Lighting <br />This report will help the City of Santa Ana to determine the necessary areas of the fountain that need <br />repair or replacement. <br />Task 07 — Fountain #1 Construction Documents $ 16,900 <br />Fountain #1 Construction Documents will incorporate the City of Santa Ana's decision for the final <br />renovation design. The plans will include: <br />• Demolition plan <br />• Fountain details and sections <br />• Utility coordination <br />• Piping Schematics <br />• Electrical requirements <br />• Specifications <br />• Chemical treatment <br />PACE will provide electronic files in both ACAD and Micro -station format. <br />
The URL can be used to link to this page
Your browser does not support the video tag.