My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) (2) - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) (2) - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:46:55 PM
Creation date
2/11/2009 11:37:03 AM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE)
Contract #
A-2009-010
Agency
Public Works
Council Approval Date
1/5/2009
Insurance Exp Date
5/1/2011
Destruction Year
2022
Notes
UC. Auto exp. 11/01/11 Amends A-2008-085
Document Relationships
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Kenny Nguyen November 5, 2008 <br />City of Santa Ana / Renovation of Fountains / #9076 Page 2 of 2 <br />Task 08 — Bid Services and Services During Construction $5,800 <br />Provide owner with a list of potential contractors, prepare bid form and quantity take -off to be included <br />with overall project bid package. Attend pre-bid and construction meetings with contractors. Provide <br />clarification, revisions and addenda, as needed to the water feature construction documents to respond to <br />bidders requests and to assist issuance and negotiation of final pricing and contractor selection. Review <br />shop -drawing submittals from contractors of products and materials for conformance to construction <br />documents. At the conclusion of the construction document phase, consultant to (1) assist in reviewing <br />bids to determine the most qualified contractor at the most reasonable cost, (2) attend pre -construction <br />meeting to kick off the start of construction appropriately and answer any questions or issues early on in <br />the process, (3) review shop drawing submittals by the chosen contractor for conformance with the <br />construction document, (4) clarify construction documents if required, (5) assist in the issuance and <br />negotiation of pricing of change orders, (6) conduct necessary site visits as required during construction <br />for review of construction progress, (7) conduct a final on-site review of construction and provide a <br />completion punch list report. Punch list to be created only once. Owner is responsible for follow through <br />of items on the punch list, (8) review completeness of contractor's final as -built drawings. Water feature <br />construction requires oversight by the engineer due to the specialized nature of the work. This item is not <br />optional and is required for the contract. <br />Amount of Compensation: <br />This Request - Change Order #01: _ <br />i` <br />Estimated By: �� November 5, 2008 <br />Sonny/O. , P k Date <br />PACE <br />
The URL can be used to link to this page
Your browser does not support the video tag.