Laserfiche WebLink
City Place Sky Lofts Final Environmental Impact Report Findings <br />4.2.6.3 Facts in Support of the Finding Related to Airport Land Use Plans <br />Implementation of mitigation measure H-1 would ensure that any aviation-related safety hazards <br />associated with the proposed project would be reduced to below a level of significance. <br />H-1 The Applicant shall file a notice of Proposed Construction or Alteration with the FAA <br />(FAA Form 7460-1). Following the FAA's Aeronautical Study of the project, projects <br />must comply with conditions of approval imposed or recommended by the FAA. A <br />notification letter will be sent to the Airport Land Use Corrnnission (ALUC) to indicate a <br />structure proposed to be in excess of 200 feet in height. <br />4.2.6.4 Level of Significance of Impacts Related to Airport Land Use Plans <br />The adverse impacts of the City Place Sky Lofts project related to Airport Land Use Plans will be <br />mitigated to below a level of significance with the implementation of mitigation measure H-1. <br />4.2.7 HYDROLOGY AND WATER QUALITY IMPACTS <br />4.2.7.1 Potentially Significant Adverse Impacts Related to Water Quality <br />As discussed in Section 4.7 (Hydrology and Water Quality) of the EIR, the construction and operation of <br />the City Place Sky Lofts project may result in the potential for significant adverse impacts to water <br />quality associated with contaminants on the site being carried from the site in runoff. <br />4.2.7.2 Finding Related to Water Quality <br />Changes or alterations have been required in, or incorporated into, the project which avoid or substantially <br />lessen the significant environmental effect as identified in the Final EIR. <br />4.2.7.3 Facts in Support of the Finding Related to Water Quality <br />Implementation of mitigation measures W-3 during construction and W-4 during operation, provided <br />below, will substantially lessen the adverse impacts of the City Place Sky Lofts project related to water <br />quality during construction and operation, and will reduce this potentially significant adverse impact to <br />below a level of significance. <br />For Construction (Storm Water Pollution Prevention PIanZ(S WPPP) <br />W-3 Prior to the commencement of soil disturbing activities, the project proponent shall submit <br />for approval to the Regional Water Quality Control Board (RWQCB), a Notice of Intent to <br />be covered under the Storm Water Permit. Additionally, the project proponent shall prepare <br />a SWPPP which will require implementation of Best Management Practices (BMPs). The <br />project proponent shall implement the SWPPP and will modify the SWPPP as directed by <br />the Storm Water Permit. These provisions shall be included in the plan notes. The SWPPP <br />shall include all of or a combination of specific BMPs as follows: <br />a) Sediment for areas disturbed by construction shall be retained on-site using <br />structural controls such as sandbags, fencing, or retention ponds. <br />F IPROJ-F_NVICity Place Sky LoftslFinal EIRIFindings-SOCIFindings-SOC.doc Page 16 <br />January 23, 2009 <br />75A-126 <br />