My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - ON-CALL LANDSCAPE SRVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
03/02/2009
>
25B - AGMT - ON-CALL LANDSCAPE SRVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:22:55 PM
Creation date
2/24/2009 3:29:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25B
Date
3/2/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. All preliminary and bid sets of plans shall be plotted on bond paper. All drawings shall be 24" x 36" on City <br />standazd title block and title sheet. <br />6. All original plan sheets, the title sheet of the specifications, calculations, and reports shall be signed and <br />stamped by the Consultant's licensed professional landscaped azchitect/engineer in responsible-chazge of the <br />project. These signed originals shall then become the property of the City. <br />7. Upon completion of construction, as-builts shall be submitted to Consultant. Consultant shall incorporate all <br />changes to the plans electronically with all necessary revision notations. Once plans have been updated, a <br />signed set of as-built mylazs shall be submitted to the City with an electronic copy of the final as-built drawings <br />via CD or a-mail. <br />8. Consultant shall tightly control the quality of the work performed by in-house staff and/or sub-consultants. <br />Incomplete (not meeting targeted % completion) or poor quality work will not be accepted. The consultant <br />shall need to revise the documents within a revised schedule set by the City, which may require overtime. No <br />additional regulaz or overtime hours shall be approved for the required revisions. <br />9. Attend meetings with City's staff as required. <br />10. Coordination with other Agencies as required. <br />11. Plan check coordination with the City of Santa Ana and other agencies as required. <br />12. Consultant shall provide construction support and be required to review and approve addenda and clarifications <br />to plans and specifications. Consultant shall attend pre-construction meetings, attend initial job walk, final <br />walk-through and assist with preparation of punch list, and attend final inspection as requested by City staff. <br />CITY RESPONSIBILITIES <br />In general, the City will be responsible for the following items: <br />• Providing copies of available plans and existing documentation on file. <br />• Providing standard City boilerplate spec. <br />• Acting as a liaison with the appropriate decision making bodies. <br />• Furnish electronic design file with City title block and title sheet (24" x 36") <br />• Process plans for governmental agency approvals having jurisdiction over the project and pay for all plan <br />check fees. <br />• Reproduce final Contract Documents for bidding purposes. All reproduction costs prior to bid documents <br />are the responsibility of the consultant. <br />CONTRACT CONSIDERATION <br />Since total actual cost cannot be pre-determined, a fee for each assigned project shall be negotiated. The Consultant <br />shall be paid based upon hourly rates, unit costs or fixed fee for services rendered. <br />PROPOSAL REJECTION <br />The City reserves the right to reject any or all proposals submitted, and is not liable for any pre-contractual <br />expenses: <br />Pre-contractual expenses are defined as expenses incurred by the offeror in: (a) prepazing the proposal in response <br />to this RFP; (b) submitting that proposal to the City; (c) negotiating with the City in any matter related to this <br />proposal; (d) any other expenses incurred by offeror prior to date of award, if any, of the contract. Offeror shall not <br />include any such expenses as pazt of the price as proposed in response to this RFP. <br />11 <br />25B-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.