My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STEVEN GAFFNEY ARCHITECTURE, INC. 1
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
S (INACTIVE)
>
STEVEN GAFFNEY ARCHITECTURE, INC. 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2015 1:53:13 PM
Creation date
3/26/2009 3:03:18 PM
Metadata
Fields
Template:
Contracts
Company Name
STEVEN GAFFNEY ARCHITECTURE, INC.
Contract #
N-2009-019
Agency
COMMUNITY DEVELOPMENT
Expiration Date
12/31/2009
Insurance Exp Date
5/1/2009
Destruction Year
2014
Notes
Amended by N-2009-019-01
Document Relationships
STEVEN GAFFNEY ARCHITECTURE, INC. 1A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\S (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ms. Nancy Edwards <br />December 1, 2008 - Page 2 <br /> <br />SCOPE OF WORK <br /> <br />The proposed work shall include Programming and Master Planning Architectural design <br />services only, <br /> <br />Basic services do not include the following consullants, engineers or services; structural, <br />mechanical and electrical engineering, landscape architecture, lighting consultant, data and <br />telecommunication designs, graphic design, interior design, geotechnical and civil engineering, <br />P~S design consul!ing, security design consuiting, audio! visual design consulling. <br /> <br />Basic Services and Responslbllllles <br /> <br />Programming ! Master Planning: During this Phase, Architect will provide the following <br />services: <br /> <br />. Meet with the City and any other City consultants to review and understand the <br />Project objectives and evaluate preliminary program options. <br /> <br />. Review and analyze the exlsling site and prepare opportunity and constraint <br />diagrams as they pertain to the program objectives. <br /> <br />. Establish general improvement guidelines for the overall Project along with phasing <br />and sequencing strategies. <br /> <br />. Prepare site scenarios that may offer more than one solulion ! options for review and <br />approval. <br /> <br />COMPENSATION <br /> <br />ProfessIonal Fees. <br /> <br />Architect proposes to perform the scope noted above on an hourly basis with a Not- <br />to-Exceed allolment of $10,000 (Ten Thousand Dollars) without prior authorization <br />from the Client. Archllect will invoice monthly based on actual dedicated hours at the <br />rates listed below. <br /> <br />Hourlv Rates: <br /> <br />Principals <br />Sr. Associates <br />Associates <br />Project Architect <br />Designer <br />Clerical <br /> <br />$210 per hour <br />$170 per hour <br />$130 per hour <br />$120 per hour <br />$100 per hour <br />$ 60 per hour <br /> <br />REIMBURSABLE EXPENSES <br /> <br />Reimbursable expenses are in addition to compensation noted above and include expenses <br />made by the architect and the architect's consullants. These expenses shall include computer <br />plots, blueprinting and reproduction, photo work, overnight delivery and messenger delivery <br />services, renderings and models. Reimbursable expenses shall also include travel expenses <br />for EDG not to exceed twelve total trips wilh a maximum of two people per trip_ Reimbursable <br />expenses will be billed at 1.15 x actual cost. <br />
The URL can be used to link to this page
Your browser does not support the video tag.