My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Public Hearing - Amendments to the Transit Zoning Code (SD-84) Zoning District and Citywide Zoning Code
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
05/06/2025
>
Item 21 - Public Hearing - Amendments to the Transit Zoning Code (SD-84) Zoning District and Citywide Zoning Code
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 3:31:43 PM
Creation date
5/1/2025 10:57:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
21
Date
5/6/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
689
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MM4.8-6 Prior to issuance of building permits, building plans shall specify the STC rating of <br />windows and doors for all residential land uses. Window and door ratings shall be sufficient to <br />reduce the interior noise level to a CNEL of 45 dBA or less, and shall be determined by a <br />qualified acoustical consultant as part of the final engineering design of the project. (Impact 4.8- <br />2) <br />MM4.8-7 Each project applicant shall provide proper shielding for all new HVAC systems used <br />by the proposed residential and mixed use buildings to achieve an attenuation of 15 dBA at 50 <br />feet from the equipment. (Impact 4.8-2) <br />MM4.8-8 The City shall provide a written statement to each applicant for projects located within <br />400 feet of the SCRRA tracks that shall be provided for each residential unit and resident, <br />notifying them of potential noise and vibration issues associated with the railroad tracks, <br />including the following: <br />Notice of Disclosure <br />Each owner's [or renter's] interest is subject to the fact that trains operate at different <br />times of the day and night on the railway tracks immediately adjacent to a project site; <br />and that by accepting the conveyance of an interest [or lease agreement] in that project, <br />owner [or renter] accepts all impacts generated by the trains. <br />Posting of Notice of Disclosure in each residential unit. <br />Prior to offering the first residential unit for purchase, lease, or rent, the property owner <br />or developer shall post a copy of the Notice of Disclosure in every unit in a conspicuous <br />location. Also, a copy of the Notice of Disclosure shall be included in all materials <br />distributed for the Project, including but not limited to: the prospectus, informational <br />literature, and residential lease and rental agreements. (Impact 4.8-8) <br />Project Analysis and Conclusion <br />The City determined that no impacts related to the proximity public use airport would not result <br />in impacts would result. Impacts related to exposure of sensitive receptors from excessive <br />groundborne vibration (Impact 4.8-3), potentially significant vibration levels (Impact 4.8-4), <br />ambient noise increase (Impact 4.8-5), periodic noise impacts (Impact 4.8-6), and noise from <br />increased traffic volumes (Impact 4.8-7) were below the level of significance and did not require <br />mitigation. Impacts from noise levels exceeding City noise standards (Impact 4.8-1) and <br />exposure to noise -sensitive land uses (Impact 4.8-2) were less than significant with the <br />implementation of mitigation measures. Impacts causing groundborne vibration and <br />development exposure near the Southern California Regional Rail Authority's (SCRRA) rail line <br />(Impact 4.8-8) and construction activities from project implementation (Impact 4.8-9) were found <br />to be significant and unavoidable. Specific economic, social, or other considerations make <br />infeasible additional mitigation. Specifically, no additional feasible mitigation measures exist that <br />would avoid or substantially reduce these impacts. <br />The proposed adoption of the text regulations identified in Table 1 — Current and Proposed Text <br />Regulations would not require preparation of a supplemental or subsequent EIR because <br />specific development projects are neither included nor required. The new regulations would limit <br />daily operations times and days of week, and maximum noise that could be generated from <br />existing uses. No industrial use shall generate ground vibration perceptible without instruments <br />at any point along the property line of the site except for motor vehicle operations. No vibration <br />shall be produced that is transmitted through the ground and is discernible without the aid of <br />instruments by a reasonable person at the property lines of the site. Vibrations from temporary <br />construction, demolition, and vehicles that enter and leave the subject parcel are exempt from <br />this standard. <br />January 2025 41 Environmental Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.