My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - 2024 General Plan Annual Progress Report
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
05/06/2025
>
Item 07 - 2024 General Plan Annual Progress Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 3:12:51 PM
Creation date
5/1/2025 2:41:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
7
Date
5/6/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
four -bedroom units for large families <br />and 43 one- and two -bedroom units. A <br />total of 85 units are for extremely low- <br />income households earning 30 <br />percent or less of AM I. The project was <br />developed on a site with split <br />ownership between the City and <br />County of Orange and was officially <br />completed in 2024 and fully occupied <br />as of October 2024. <br />»Above: Picture of the front entrance to Crossroads at Washington. <br />The Santa Ana City Council on October 15, 2024 unanimously approved the largest and <br />highest -valued mixed -use, master -planned development in the City's history, the 41-acre, <br />$2.9 billion Related Bristol Specific Plan. The project by Related California is located near <br />South Coast Plaza along a major business corridor in an area bordered by South Bristol <br />Street, South Plaza Drive, West MacArthur Boulevard, and Sunflower Avenue. <br />The Related Bristol Specific Plan includes up to 3,750 residential units, 200 senior living <br />units, a 250-room hotel, and 350,000 square feet of commercial space. It will also feature <br />approximately 13.1 acres of publicly accessible open space, including parks, plazas, <br />walkways, and other green spaces. Work on Related Bristol is expected to begin in 2026 <br />and to be completed in three phases, with the entire development finished in 2036. <br />»Above: Rendering of Related Bristol Specific Plan. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.