My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - 55 AND ALTON AVE OVERCROSSING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
04/06/2009
>
25D - 55 AND ALTON AVE OVERCROSSING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:21:53 PM
Creation date
4/1/2009 2:14:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25D
Date
4/6/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 5.4 ProfilelSuperelevation Diagrams <br />Huitt-Zollars will refine the Project Report profiles and superelevation diagrams, for freeway, ramp and arterial road <br />improvements that include original ground, profile grade information and superelevation data. <br />Task 5.5 Design Information Bulletin (DIB) 78-02 Checklist <br />Huitt-Zollars will complete the DIB 78-02 Checklist. <br />Task 5.6 DIB 82-03 Pedestrian Accessibility Guidelines for Highway Projects <br />Huitt-Zollars will ensure that the design is completed incompliance with DIB 82-03. <br />Task 5.7 Truck Turning Templates <br />Huitt-Zollars will prepare truck turning template exhibits to verify that larger STAA and California vehicles properly <br />traverse the proposed intersections. <br />Task 5.8 Design Speed Sight Distance Analysis <br />Huitt-Zollars will prepare Sight Distance Exhibits for bridge barrier and intersection sight distance locations. <br />Plans, Specifications and Estimates <br />TASK 6.0 30% ROADWAY PS&E <br />Once GAD is approved by the City and Caltrans, Huitt-Zollars will develop plans to 30% Caltrans standards for <br />PS&E. The plan sheets will include: <br />Task 6.1 Title Sheet <br />Huitt-Zollars will prepare a title sheet that includes an index of sheets, the project description, location map, <br />structures list, begin/end work, beginlend construction, and limits of work. <br />Task 6.2 Typical Cross-Section Sheets <br />Huitt-Zollars will prepare typical section sheets for freeway lanes, ramps and arterial road improvements that <br />include original ground, traveled way, shoulders, cutlfill slopes, retaining and sound walls, existing/proposed right <br />of way and existinglrecommended structural sections. <br />Task 6.3 Key MaplLine Index Sheet <br />Huitt-Zollars will prepare a key maplline index sheet that includes a location outline of plan view sheets. A <br />summary table defining the location of each roadway sheet will be prepared. Horizontal alignments will be <br />identified and annotated with the "Line" name. <br />Task 6.4 Layout Sheets <br />Huitt-Zollars will prepare base geometrics and layout sheets that include centerline and curb geometric data <br />required to construct the project. Geometric curve data will be organized in a data table. The ultimate Striping <br />Plan will be superimposed on Layout Plan to depict lane configurations. A legend and abbreviations list will be <br />prepared along with a "location of sheet" diagram for ease of layout understanding. The limits of pavement <br />removal and replacement, as well as pavement overlay limits, will be defined on the layout sheets. <br />Task 6.5 ProfilelSuperelevation Sheets <br />Huitt-Zollars will prepare profile and superelevation sheets for street, freeway and ramp improvements that include <br />original ground, profile grade information and superelevation data. Profiles (not superelevation diagrams) will be <br />provided for new curb adjacent sections of pavement widening. <br />Task 6.6 Design Cross-Sections <br />Design cross-sections will be provided at 100-foot intervals. <br />Task 6.7 Right-of-Way Requirements Exhibit <br />Huitt-Zollars will prepare aRight-of-Way requirements exhibit based on the right of way requirements for the 30% <br />PS&E Project. The Right-of-Way requirement exhibit will define existing property limits, property acquisition, <br />Temporary Construction Easements (TCE), roadway easements, and any necessary utility easement areas for the <br />25D-57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.