Laserfiche WebLink
4 affected parcels. Based on the approved Project Report, there is no right-of-way acquisition necessary for <br />Caltrans anticipated at this time. <br />Task 6.8 Right-of-Way Acquisitions Plats and Legal Descriptions <br />Huitt-Zollars will prepare Right-of-Way acquisition plats and legal descriptions for Right of Way acquisition and/or <br />Temporary Construction Easements, as required, based on the information shown in the Right-of-Way <br />Requirements exhibit. Huitt-Zollars will prepare legal descriptions and plats for property acquisition and/or <br />easements for the 4 properties within the project area. <br />TASK 7.0 60% and 95% ROADWAY PS&E <br />Task 7.1 Roadway 60% PS&E <br />Huitt-Zollars will complete roadway, drainage, traffic, miscellaneous plans, special provisions, the engineer's <br />estimate and a draft drainage report for review by the City and Caltrans at the 60% completion stage. The title <br />sheet for specifications and reports, and each sheet of plans, will bear the professional seal, certificate number, <br />registration classification, and expiration date of the certificate of the professional engineer responsible for their <br />preparation. Huitt-Zollars will prepare the following sheets: <br />Task 7.1.1 Title Sheet <br />Task 7.1.2 Typical Cross-section Sheets <br />Task 7.1.3 Key MaplLine Index Sheet <br />Task 7.1.4 Layout Sheets <br />Task 7.1.5 ProfilelSuperelevation Sheets <br />Task 7.1.6 Construction Detail Sheets <br />Construction detail sheets will be prepared for ramp gores, street intersections, driveways, curb transition details, <br />irrigations crossovers, bus and maintenance vehicle pullouts, and miscellaneous details required for the project. <br />Task 7.1.7 Contour Grading Sheets <br />Huitt-Zollars will prepare contour grading sheets. Major drainage features will be shown along with cut/fill lines <br />and design contours. <br />Task 7.1.8 Roadway Quantities Summary Sheets <br />Task 7.1.9 Retaining Wall Sheets <br />Huitt-Zollars will prepare retaining wall sheets including typical sections, details and architectural treatments. <br />Task 7.1.10 Sound Wall Sheets <br />Based on the sound wall requirements identified in the Environmental Re-Validation, Huitt-Zollars will prepare <br />sound wall sheets including typical sections, details and architectural treatments. <br />Task 7.1.11 Drainage Design Sheets <br />Huitt-Zollars will prepare drainage plan, profile, details and quantity sheets. <br />Task 7.1.12 Temporary Water Pollution Control Sheets <br />Huitt-Zollars will prepare plans for temporary erosion control facilities for the project. Design of these facilities <br />will include current Best Management Practices and will conform to the City and other requirements of Caltrans <br />and the Regional Water Quality Control Board (RWQCB). <br />Task 7.1.13 Erosion Control Sheets <br />Huitt-Zollars will prepare plans for permanent erosion control facilities for the project. Design of these facilities <br />will include current Best Management Practices and will conform to the City and other requirements of Caltrans <br />and the Regional Water Quality Control Board. <br />Task 7.1.14 Utility Sheets <br />Huitt-Zollars will prepare utility sheets that will depict both existing and relocated utilities. Preliminary Utility <br />Plans will be sent to all utility companies that may have utilities in the area for confirmation of any existing or <br />proposed new utilities. <br />25D-58 <br />