Laserfiche WebLink
• Girder Layout <br />• Girder Details <br />• Typical Sections <br />• Miscellaneous Details <br />• Aesthetic Details <br />• Slope Paving <br />• Structure Approach <br />• Approach Drainage Details <br />Deliverables: The Huitt-Zollars Team will provide 4 copies of unchecked Structure Plans. <br />Task 8.3 Structures 95% PS&E (Checked Details) <br />The Huitt-Zollars Team will conduct independent checking and prepare a complete structures PS&E package for <br />formal submittal and review. Prior to completing the package, the Huitt-Zollars Team will schedule a review <br />session, if required, with the reviewing agencies to confirm the intent of informal comments on 65% structures <br />PS&E package. <br />Task 8.3.1 Structures Independent Check <br />An Independent Check will be conducted. Checking will include the preparation of an independent set of <br />structural design check-calculations and a review of the entire structural PS&E package. <br />Task 8.3.2 Structural Quantities <br />The Huitt-Zollars Team will prepare quantities for contract items, including the cost of lump sum items, which will <br />be substantiated by calculations. Quantity calculations will show sketches, diagrams and dimensions necessary <br />to allow them to be independently used by field engineers. <br />Task 8.3.3 Structures Estimate <br />The Huitt-Zollars Team will develop unit costs and prepare a structures cost estimate utilizing Caltrans' quantity <br />Summary and Estimate Forms. <br />Task 8.3.4 Structures Special Provisions <br />The Huitt-Zollars Team will prepare project specific Structure Special Provisions in accordance with Caltrans <br />standards. The Structure Special Provisions will bear the State of California Registered Professional Engineer <br />registration seal with the signature, license number and registration certificate expiration date of the Engineer who <br />prepared the Special Provisions or the Engineer under whose direction they were prepared. A list of contract items <br />with item descriptions, item numbers, and units of pay, and item pay codes, but without quantities or estimated unit <br />costs, will be included in the Special Provisions. <br />Deliverables: The Huitt-Zollars Team will provide 1 electronic copy of checked, signed Structure Plans; 10 sets <br />of prints of checked, signed Structure Plans; 4 copies of edited Structure Special Provisions; 1 copy of edited <br />Structure Special Provisions on a CD or other media as requested; 2 copies of the Bridge Cost Estimate; 1 copy <br />of bridge design calculations. <br />Task 8.4 Structures 100% PS&E <br />Upon receipt of comments, and prior to commencing revisions, the Huitt-Zollars Team will schedule a review <br />session, if required, with the reviewing agencies to confirm intent of comments. <br />The Huitt-Zollars Team will furnish Final Plans, Specifications and Estimate for advertising, as well as hard copy <br />and electronic files of spreadsheets used to create the estimates. The structures PS&E will incorporate 100% <br />comments from reviewing agencies. <br />Deliverables: The Huitt-Zollars Team will complete structures PS&E and provide 1 electronic copy of checked, <br />signed Structure Plans; 1 set of full-size reproducible of final Structure Plans, 4 sets of prints of final Structure <br />Plans; 4 copies of final Structure Special Provisions; 1 copy of the final Structure Special Provisions on a CD or <br />25D-63 <br />