My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - 55 AND ALTON AVE OVERCROSSING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
04/06/2009
>
25D - 55 AND ALTON AVE OVERCROSSING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:21:53 PM
Creation date
4/1/2009 2:14:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25D
Date
4/6/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
other media as requested; 4 copies of the Bridge Cost Estimate; 1 reproducible and 2 prints of Bridge 4-Scale <br />Plans (English). <br />TASK 9.0 DISTRICT PS&E <br />Task 9.1 District 100% PS&E Package <br />Huitt-Zollars will complete Roadway, Drainage, Traffic, Miscellaneous Plans, Special Provisions, the Engineer's <br />Estimate and a final Drainage Report for review by the City and Caltrans at the 100% completion stage. The title <br />sheet for specifications and reports, and each sheet of plans, will bear the professional seal, signature, certificate <br />number, registration classification, expiration date of the certificate of the professional engineer responsible for <br />their preparation. The approved Structures PS&E package will be included. Huitt-Zollars will prepare the following <br />sheets: <br />• Title Sheet <br />• Typical Cross-section Sheets <br />• Key Map/Line Index Sheet <br />• Layout Sheets <br />• ProfilelSuperelevation Sheets <br />• Construction Detail Sheets <br />• Contour Grading Sheets <br />• Roadway Quantities Summary Sheets <br />• Retaining Wall Sheets <br />• Sound Wall Sheets <br />• Drainage Design Sheets <br />• Temporary Water Pollution Control Sheets <br />• Erosion Control Sheets <br />• Utility Sheets <br />• Stage ConstructionlTraffic Handling Sheets <br />• Construction Area Sign Sheets <br />• Pavement Delineation Sheets <br />• Sign Sheets <br />• Electrical Sheets <br />• Revised Standard Plan Sheets <br />• Roadway Special Provisions <br />• Roadway Engineer's Estimate <br />• Final Hydrology/Drainage Report <br />• Final Storm Water Data Report <br />• Final Traffic Management Plan (TMP) <br />• Final Construction CPM Schedule <br />• Final Storm Water Pollution Protection Plan <br />• Structures 100% PS&E <br />Task 9.2 Design Cross-Sections <br />Design cross-sections will be provided at 50-foot intervals for design alignments. <br />TASK 10.0 LANDSCAPING PS&E <br />Task 10.1 Meetings <br />The Huitt-Zollars Team will attend one landscape kick-off meeting and up to seven Project Development Team or <br />other meetings that are focused on landscaping. Attendance by the Huitt-Zollars Landscape Team at meetings <br />beyond the eight listed are available as an additional service and fee. <br />25D-64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.