My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23C - BRISTOL ST WIDENING - MCFADDEN TO PINE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/04/2009
>
23C - BRISTOL ST WIDENING - MCFADDEN TO PINE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:21:01 PM
Creation date
4/29/2009 12:56:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23C
Date
5/4/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award a contract to All <br />bidder, in accordance with <br />$8,315,754 for constructio <br />Avenue to Pine Street. <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on 1 S` Reading <br />^ Ordinance on 2"d Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />American Asphalt, <br />unit bid prices in <br />n of Bristol Street <br />the lowest responsible <br />the estimated amount of <br />Widening from McFadden <br />2. Approve a Funding Analysis with a total estimated construction cost <br />of $11,226,000. <br />REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />MAY 4, 2009 <br />TITLE: <br />CONTRACT AWARD FOR BRISTOL <br />STREET WIDENING FROM MCFADDEN <br />AVENUE TO PINE STREET <br />(PROJECT NOS. 06-1500, 07-3206, <br />AND 09-3521) <br />DISCUSSION <br />Bristol Street is the north-south corridor designated as a major <br />arterial highway in the City's Circulation Element of the General Plan. <br />The widening of Bristol Street between Warner Avenue and Memory Lane is <br />a long-term project that will be constructed in several phases. This <br />project includes the segment between McFadden Avenue and Pine Street <br />(Exhibit 1). Overhead utility lines were placed underground in 2008 in <br />accordance with the Bristol Street Specific Plan adopted by the City <br />Council in 1993. <br />With this project, Bristol Street will be widened from two lanes to <br />three lanes in each direction with a landscaped median. The widening <br />will also provide bus turnouts in both directions, enhanced parkway <br />landscaping, sound walls adjacent to the remaining parcels and alleys, a <br />new water main, sidewalk, and curb and gutter. Once completed, these <br />improvements will enhance the ride quality, surface drainage, and visual <br />appearance of Bristol Street. <br />23C-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.