Contract Award For Bristol <br />Street Widening, Phase I <br />May 4, 2009 <br />Page 2 <br />The Notice Inviting Bids was advertised on February 18 and 20, 2009, and <br />bids were opened on April 1, 2009. A summary of the bid invitations <br />mailed, the bids received, and the bid results follows. <br />Santa Ana Contractors receiving notices: 21 <br />Contractors requesting bidding documents: 63 <br />Bids received: 11 <br />Bids received from Santa Ana Contractors: 2 <br />NAME OF RESPONSIVE BIDDER <br />CITY <br />BID AMOUNT <br />1. All American Asphalt <br />2. Sequel Contractors, Inc. <br />3. R. J. Noble Company <br />4. Shawnan <br />5. Hillcrest Contracting, Inc. <br />6. Sukut Construction, Inc. <br />7. Excel Paving Company <br />8. Griffith Company <br />9. Los Angeles Engineering, Inc. <br />10. Beador Construction Co., Inc. <br />11. Sully Miller Contracting <br />Corona <br />Santa Fe Springs <br />Orange <br />Downey <br />Corona <br />Santa Ana <br />Long Beach <br />Santa Ana <br />Covina <br />Corona <br />Anaheim <br />$8,315,754.00 <br />$8,487,462.50 <br />$8, 526, 993.70 <br />$8,998,734.50 <br />$9,244,429.50 <br />$9,506,664.00 <br />$9,655,333.00 <br />$9,738,147.00 <br />$10,004,064.00 <br />$10,807,700.00 <br />$10,836,371.30 <br />After the bids were opened, Sequel Contractors, Inc. (Sequel) submitted <br />a bid protest claiming that the bid submitted by All American Asphalt <br />(AAA) was non-responsive. According to a procedure established in the <br />bidding documents, the Director of Public Works Agency conducted an <br />administrative hearing to determine the merit of the protest. Specific <br />assertions of Sequel and staff's findings are summarized below. <br />First, Sequel stated that in the bidding document AAA had listed two <br />sub-contractors but indicated that AAA would perform a portion of the <br />work. Sequel asserted that by doing so, AAA would be allowed to do "bid <br />shopping". <br />Second, Sequel claimed that by adding up the amounts of the bid prices, <br />included in the List of Sub-Contractors, AAA would perform less than 500 <br />of the work. This would not be in compliance with the Standard <br />Specifications for Public Works Construction. <br />Public Works staff and the City Attorney's office after listening to the <br />information presented at the protest hearing by Sequel and AAA, has <br />determined that AAA's bid is responsive and recommends that they be <br />awarded the construction contract for the Bristol Street Widening. <br />23C-2 <br />