My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - 6 E MACARTHUR PLACE - NEXUS DEVELOP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/04/2009
>
75B - PH - 6 E MACARTHUR PLACE - NEXUS DEVELOP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:21:26 PM
Creation date
4/29/2009 12:57:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
5/4/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by the project contractors, as appropriate during site preparation, grading and <br />construction. <br />31. Prior to issuance of a grading permit, the project developer shall prepare a Final <br />Storm Water Pollution Prevention Plan (SWPPP). This plan shall be submitted and <br />approved by the City Engineer prior to initiation of any grading activity. The project <br />shall maintain the SWPPP on the construction site throughout the construction <br />period. <br />32. During all site preparation, grading and construction, the project developer shall <br />ensure that its contractor implements the provisions of the SWPPP. <br />33. Prior to the issuance of grading permits, the project developer shall submit a <br />Final Water Quality Management Plan (WQMP) based on the Final Grading Plan, <br />to be approved by the City's Director of Public Works. The WQMP shall be <br />consistent with the DAMP and shall contain provisions and BMPs for construction <br />and operation conditions. <br />34. Prior to the issuance of building permits, the project developer shall pay the <br />City's drainage impact fee. <br />35. Prior to the issuance of grading permits, the project developer shall verify that <br />structural BMPs have been permanently incorporated into project plans. Such <br />BMPs shall ensure that pollutants from project-related storm water runoff are <br />mitigated consistently with applicable state and local standards. <br />36. Prior to issuance of grading permits, the project developer shall submit a final <br />drainage plan to the City identifying the exact size and location of drainage <br />facilities. <br />37. Prior to issuance of grading permits, the project developer shall provide proof of <br />an NPDES permit from RWQCB to the City for onsite dewatering activities. <br />38. Prior to issuance of building permits, the project developer shall ensure that any <br />restaurant is fitted with grease interceptors to the size and capacity as <br />designated by the City of Santa Ana Building Division. <br />39. Prior to building occupancy, to the extent possible, all equipment shall be <br />enclosed within a building or separate structure. Where this is not possible, <br />barriers may be necessary to shield the equipment from the existing and <br />proposed residential buildings. Depending on the size and style of the <br />Resolution No. 2009- <br />Page 25 of 30 <br />75B-137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.