My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - 6 E MACARTHUR PLACE - NEXUS DEVELOP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/04/2009
>
75B - PH - 6 E MACARTHUR PLACE - NEXUS DEVELOP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:21:26 PM
Creation date
4/29/2009 12:57:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
5/4/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equipment, silencers in the intake and exhaust ducts may also be necessary to <br />reduce noise at the residential buildings to an acceptable level. <br />40. Construction plans for the proposed project shall reflect the following note: <br />"During demolition and construction, the contractor shall adhere to all City Noise <br />Ordinance requirements to limit all construction activity, including equipment <br />start-up, to between the hours of 7:00 a.m. and 8:00 p.m. Mondays through <br />Saturdays. No construction shall take place on Sundays or federal holidays. <br />41. During construction, the contractor shall site all construction staging and storage <br />areas away from sensitive receptors to the furthest extent possible. <br />42. During construction activities, the project developer shall ensure that all pile <br />driving equipment shall be enclosed on all sides with an acoustical blanket <br />barrier that provides a minimum sound transmission class (STC) rating of 30. <br />The height of the blanket enclosure shall be at least 20-feet. With the exception <br />of points of access to the enclosure area, there shall be no openings or gaps in <br />the enclosure, and all points of access are to remain closed during pile driving <br />activities. Notwithstanding Mitigation Measure No. 67, pile driving shall not <br />commence prior to 8:00 a.m. on Saturday. <br />43. Prior to issuance of grading permits, the project developer shall submit a <br />construction equipment staging plan to the City of Santa Ana for approval. <br />44. Prior to the start of construction activity, the project developer shall post the <br />name and telephone number of the construction relations officer on-site. <br />45. Prior to any site preparation, grading or construction, the project contractor shall <br />provide to resident associations in the Sandpointe neighborhood, the Main <br />Attraction Condominiums and the .Pinnacle Apartments a project schedule <br />indicating the type of construction activity and duration, construction staging <br />areas and the name and telephone number of the construction relations officer. <br />46. Prior to issuance of a building permit, the project developer shall coordinate any <br />required relocation of fire hydrants on the property with Santa Ana Fire <br />Department. Final approval from the Fire Department is required regarding <br />location of hydrants on the project site. <br />47. Prior to issuance of a grading permit, the project developer shall submit building <br />plans to the Santa Ana Police Department in order to ensure compliance with the <br />City of Santa Ana's Building Security Ordinance. The Police Department must <br />approve the building plans with regard to the Building Security Ordinance prior to <br />initiation of grading. <br />Resolution No. 2009- <br />Page 26 of 30 <br />75B-138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.