Laserfiche WebLink
equipment, silencers in the intake and exhaust ducts may also be necessary to <br />reduce noise at the residential buildings to an acceptable level. <br />40. Construction plans for the proposed project shall reflect the following note: <br />"During demolition and construction, the contractor shall adhere to all City Noise <br />Ordinance requirements to limit all construction activity, including equipment <br />start-up, to between the hours of 7:00 a.m. and 8:00 p.m. Mondays through <br />Saturdays. No construction shall take place on Sundays or federal holidays. <br />41. During construction, the contractor shall site all construction staging and storage <br />areas away from sensitive receptors to the furthest extent possible. <br />42. During construction activities, the project developer shall ensure that all pile <br />driving equipment shall be enclosed on all sides with an acoustical blanket <br />barrier that provides a minimum sound transmission class (STC) rating of 30. <br />The height of the blanket enclosure shall be at least 20-feet. With the exception <br />of points of access to the enclosure area, there shall be no openings or gaps in <br />the enclosure, and all points of access are to remain closed during pile driving <br />activities. Notwithstanding Mitigation Measure No. 67, pile driving shall not <br />commence prior to 8:00 a.m. on Saturday. <br />43. Prior to issuance of grading permits, the project developer shall submit a <br />construction equipment staging plan to the City of Santa Ana for approval. <br />44. Prior to the start of construction activity, the project developer shall post the <br />name and telephone number of the construction relations officer on-site. <br />45. Prior to any site preparation, grading or construction, the project contractor shall <br />provide to resident associations in the Sandpointe neighborhood, the Main <br />Attraction Condominiums and the .Pinnacle Apartments a project schedule <br />indicating the type of construction activity and duration, construction staging <br />areas and the name and telephone number of the construction relations officer. <br />46. Prior to issuance of a building permit, the project developer shall coordinate any <br />required relocation of fire hydrants on the property with Santa Ana Fire <br />Department. Final approval from the Fire Department is required regarding <br />location of hydrants on the project site. <br />47. Prior to issuance of a grading permit, the project developer shall submit building <br />plans to the Santa Ana Police Department in order to ensure compliance with the <br />City of Santa Ana's Building Security Ordinance. The Police Department must <br />approve the building plans with regard to the Building Security Ordinance prior to <br />initiation of grading. <br />Resolution No. 2009- <br />Page 26 of 30 <br />75B-138 <br />