My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - 6 E MACARTHUR PLACE - NEXUS DEVELOP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/04/2009
>
75B - PH - 6 E MACARTHUR PLACE - NEXUS DEVELOP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:21:26 PM
Creation date
4/29/2009 12:57:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
5/4/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
48. Prior to issuance of a building permit, the project developer shall prepare a <br />Mandated Security Plan, which would need final Police department approval. <br />The plan is required to address issues such as onsite uniform security staffing, <br />restriction of hours of operation for the parking garages, implementation of <br />electronic security, mechanical surveillance, and compliance with the basic <br />principles of Crime Prevention Through Environmental Design. <br />49. Prior to issuance of a building permit, the project developer shall comply with <br />Senate Bill 50 and pay applicable school impact fees. Currently, the Santa Ana <br />Unified School District's adopted Fee Justification for residential development is <br />$2.14 per square foot and $0.33 per square foot for commercial development. <br />50. Prior to issuance of a building permit, the project developer shall ensure that the <br />appropriate park Acquisition and Development Fee and parkland dedication or in- <br />lieu payments have been made. <br />51. Prior to issuance of building permits, the project developer shall submit a <br />Construction Plan to Santa Ana Fire Department. The plan must be consistent <br />with the Fire Department Fire Code requirements and must show that emergency <br />access to the construction site is adequate. <br />52. Prior to issuance of building permits, the project developer shall provide evidence <br />to the Santa Ana Fire Department that the proposed fire protection and life <br />saving systems incorporated in the project are adequate. <br />53. Prior to issuance of building permits, the project developer shall submit the final <br />design of the project, including fire sprinklers system design to the Santa Ana <br />Fire Department for approval. <br />54. Prior to issuance of building occupancy permits, the project developer in <br />cooperation with the City of Santa Ana, shall provide for the restriping of the <br />outside southbound through lane at the intersection of Main Street and Sunflower <br />to a shared through and right turn lane. <br />55. Prior to issuance of building occupancy permits, the project developer in <br />cooperation with the City of Santa Ana, shall provide for the restriping the shared <br />through right-turn lane at Hutton Centre Drive and MacArthur Boulevard to <br />provide an exclusive through lane and construct a second northbound right turn <br />lane for the northbound traffic. <br />56. Prior to issuance of building occupancy permits, the project developer shall pay <br />for the construction of a third eastbound through lane on MacArthur Boulevard <br />between Hutton Centre Drive/Imperial Promenade and the SR-55 northbound on- <br />ramp. <br />Resolution No. 2009- <br />Page 27 of 30 <br />75B-139 <br />
The URL can be used to link to this page
Your browser does not support the video tag.