My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - PARK LANDSCAPE MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/18/2009
>
25C - PARK LANDSCAPE MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:20:07 PM
Creation date
5/13/2009 3:38:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
5/18/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.5.5 When dragging the skinned infield, the contractor shall stay away from <br />all turf edges a minimum of 18". This will help in avoiding lips at <br />brickdust/turf edges. This 18' gap shall also apply to all backstops and <br />chain link fence areas. <br />7.5.6 Contractor shall hand rake all base paths on combination turf/brickdust <br />infields. <br />7.5.7 When the dragging process is complete, the contractor shall stop the drag <br />in a different location daily. This will stop the accumulation of brickdust <br />in focused areas. At this time roll-up the drag, place it on the vehicle and <br />remove all debris accumulated in the drag at this spot and rake out <br />material emptied from drag. <br />7.5.8 After dragging, hand rake the 18" edges using the "grade or grooming <br />rake". The rake shall be held at an angle as to not push brickdust <br />onto/into turf areas. <br />7.5.9 After raking the 18" edges, the contractor shall clean all excess brickdust <br />on the turf edges utilizing a high pressure water one (1) time per week. <br />NO brickdust shall be permitted on the turf edges at any time.If in the <br />determination of City staff, an unsafe lip situation exists (an unsafe lip is <br />''/2" or greater) in any turf/brickdust border area infield to brickdust, base- <br />paths or brickdust to outfield), contractor will be required to remove or <br />level the soil build-up with a sod cutter and re-establish the in-field <br />boundaries with a string line or suitable method and re-sod up to the <br />border to remedy the situation at contractors expense. Pre-existing <br />conditions shall be corrected during contract start-up. <br />7.6 Final Watering <br />7.6.1 This is the most time consuming and a very important element of the <br />procedure. <br />7.6.2 The contractor shall final water the skinned brickdust to a depth of '/a" <br />minimum. <br />8.0 Rainy Weather/Wet Field Procedure <br />8.1 On the next scheduled working day after a rainfall, the following procedure, in the order <br />listed, shall be adhered to: <br />8.1.1 Remove all standing water from low spots either by skimming off excess <br />water and spreading it out to dry areas or using apump/sopper system. <br />8.1.2 Rake out (scarify) wet areas. <br />8.1.3 Apply Dry Gail Materials "Pro Gold with Stabilizer" Brickdust Materials <br />from stock to all Wet Areas and Rake Out. <br />~s <br />25C-42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.