My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - PARK LANDSCAPE MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/18/2009
>
25C - PARK LANDSCAPE MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:20:07 PM
Creation date
5/13/2009 3:38:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
5/18/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.0 Work to be Completed "BI-MONTHLY" <br />9.1 To maintain levelness of all fields, contractor shall, once every two months, scarify drag <br />built up amounts of materials at high spots and cut and level drag the scarified material <br />to low spots. The Contractor shall fill any remaining low spots with new Gail Materials <br />"Pro Gold with Stabilizer" brickdust from stock and make level. <br />Note: Staff shall identify areas to scarify/cut and level drag to <br />the contractor at weekly meetings with contractors <br />appointed site supervisor (as per section 6.2 of contract). <br />9.2 Heavy water scarited and cut and leveled areas to a '/z" min. depth and allow settling in <br />before play on field. <br />Note: Due to heavy watering and its need to settle before play, <br />staff shall provide a schedule of bi-monthly scarify/cut <br />and level drag dates to contractor. <br />10.0 Work to be Completed "ANNUALLY" <br />10.1 Each year, the following renovation is to be done on all fields in conjunction with the <br />City's Annual Sports Turf Renovation Schedule. Fields renovated may change from <br />year to year. <br />10.1.1 Contractor shall laser grade each ball diamond. Contractor shall scarify <br />drag built up amounts of materials at high spots and cut and level drag <br />the scarified material to low spots. The Contractor shall fill any <br />remaining low spots with new Gail Materials "Pro Gold with Stabilizer" <br />brickdust from stock and make level. <br />Note: Staff shall identify areas to scarify/cut and level drag at <br />the November meeting with contractor's owner (as per <br />section 6.3 of contract). <br />10.1.2 Contractor shall verify all base distances, pitching rubber distances and <br />pitching mound heights per the Little League, Pony/Colt League <br />specifications for each specific field. Contractor shall repair any <br />specifications not being met on any field. <br />10.1.3 ~ In addition, contractor shall install 1/2" new Gail~Materials "Pro-gold <br />with Stabilizer" (brickdust) to in-fields at all diamonds (minimum 26 <br />tons per Girls Softball/Major Little League Field and minimum 40 tons <br />per Junior/Senior Little League Field). Also, the contractor shall install a <br />minimum of 1 ton of Turface calcite clay per Girls Softball/Major Little <br />League Field and 2 tons of Turface calcite clay to Junior/Senior Little <br />League Fields Responsibility for and purchase of necessary materials <br />shall be at contractor's expense. <br />39 <br />25C-43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.