My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - PARK LANDSCAPE MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/18/2009
>
25C - PARK LANDSCAPE MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:20:07 PM
Creation date
5/13/2009 3:38:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
5/18/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Note: The City has the right to move brickdust and Turface <br />materials to other infields under this agreement should <br />they decide that an infield or infields do not require <br />additional materials a particular year. <br />11.0 Work To Be Completed "AS DIRECTED" <br />11.1 Replace Base ANCHORS as directed. (This will be considered extra work.) <br />Note: City of Santa Ana use's the Hollywood base anchoring <br />system. Contractor shall install base anchors into the <br />ground per manufacturer's standards. Top of stake shall <br />be approximately 2" below the surface grade so that the <br />base sits level and flush against the surface on all sides. <br />1 1.2 Replace Bases as directed. (This will be considered extra work.) <br />Note: City of Santa Ana shall be responsible for supplying all <br />necessary base anchors and/or bases to the contractor as <br />needed. <br />1 1.3 Replace or Remove/Level/Re-Install home plates as directed. <br />1 1.4 Replace or Remove/Level/Re-Install pitching rubbers as directed. <br />Note: City of Santa Ana shall be responsible for supplying all <br />necessary home plates and/or pitching rubbers to the <br />contractor as needed. <br />11.5 When given direction to complete "as directed" work, contractor shall complete the <br />directed work on the next working day. <br />12.0 infield Turf Maintenance <br />12.1 Infield turf shall mean all sport turf in the infield, the foul territory of the infield and 36" <br />beyond the infield brickdust skin line/arc. Infield turf shall be mowed three (3) times <br />per week February -August and one (1) time per week September -January. <br />12.1.] Contractor shall use a "greens" reel mower to provide "putting green" <br />quality finish cut. <br />12.1.2 Infield turf shall be cut between '/z" and 3/4" per staffs direction. <br />12.1.3 All turf clippings shall be collected and disposed of. <br />12.21nfield turf shall be irrigated to maximize healthy growth of the turf while conserving <br />water. Over watering will not be acceptable. <br />~o <br />25C-44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.