Laserfiche WebLink
with #20 white silica sand mixed with LaPrima XD Bermuda grass seed during <br />the spring/summer and Stovers Grand Slam perennial rye grass seed during the <br />fall winter to re-establish the areas. <br />b) Areas of the field where turf has been worn away due to play shall be raked, <br />dragged and leveled each day to provide alevel-playing surface free of divots, <br />depressions and uneven surfaces. The Contractor shall add approved topsoil to <br />these areas as necessary to keep the areas level and safe. <br />c) Annually, the Contractor shall top dress outfield turf using Aguanaga Santa Ana <br />mix or approved product. Apply with an approved top dressing machine that <br />will achieve a level playing surface. <br />d) The Dan Young Soccer Complex and Santa Ana Stadium Field Synthetic Turf <br />sport turf maintenance and inspection. The field shall be maintained daily <br />Monday through Friday per the Synthetic Turf Maintenance Specifications (see <br />Attachment 4). Maintenance will include ~~rooming and cleaning the field using <br />grooming equipment provided by the City. The field shall be inspected every <br />day Monday through Friday. Contractor shall remove all debris from the field <br />upon discovery. <br />13. Sport Cow-t Maintenance <br />a) All sport courts shall be blown off daily. Courts and fence lines shall be <br />completely free of dirt, debris, etc. <br />b) All sport Courts shall be washed down every other week to remove dust, gum <br />and stains. The courts shall have water removed immediately following the <br />washing down. <br />c) Contractor shall replace tennis and basketball nets when they become worn. <br />The City shall furnish nets. <br />14. General Maintenance and Clean-up For All Parks and Contracted Sites <br />a) All trash and debris on the ground or in trash receptacles shall be removed from <br />all worksites each day Monday through Sunday before 12:00 p.m. This includes <br />all landscape areas, paved areas, street curb gutters, flood control channels, etc. <br />b) The contractor shall rake, hand remove, or vacuum leaves that are not absorbed <br />by planting. This shall be done as often as required to maintain a neat <br />appearance. <br />c) After heavy windstorms or other inclement weather that impacts sites under this <br />agreement, the Contractor shall bring in extra staff to clean all parks areas within <br />two (2) days at no cost to the City. Debris, such as but not limited to, litter, <br />fallen branches, trash, limbs, branches, soil erosion, etc., shall be removed from <br />the worksites. <br />d) The Contractor shall keep sidewalks and all other paved areas swept and free of <br />any debris, dirt, glass, weeds, leaves, etc. at all times. <br />z~ <br />25C-119 <br />