Laserfiche WebLink
excessive over spray/runoff into street right-of--ways or other areas not <br />intended to receive irrigation is controlled. The Contractor shall repair at <br />his own expense any irrigation head and lateral line rendered inoperable or <br />malfunctioning due to attrition vandalism, etc. <br />(2) Contractor shall perform a visual inspection of all irrigated areas once per <br />week. All areas receiving marginal coverage shall receive supplemental <br />irrigation by being irrigated by a portable irrigation method. The <br />contractor shall furnish al( portable hoses, nozzles, sprinklers, etc., <br />necessary to accomplish this additional irrigation. Care shall be exercised <br />to prevent a waste of water, erosion, and/or detrimental seepage into <br />existing underground improvements or structures. <br />e) Repairs <br />The Contractor shall be responsible for repairs to all irrigation heads, swing <br />joints and lateral lines as a part of this a~~reement. The Director will be <br />responsible for repairs to the irri~~~~tii~n s~~stcm li~on~ the v~llvc t~~ the ~~~~tcr mct~r. <br />~). Flardscanc Maintenance <br />a) All paved areas, including but not limited to paved parking lots. curb gutters.. <br />pool decks, stamped or other enriched hard surface areas, shall be thoroughly <br />cleaned once a week between Monday and Friday. Vacuums, blowers, <br />sweepers or other approved equipment may be used to clean hardscape areas. <br />Debris shall not be blown or swept onto adjacent streets or property. All debris <br />must be picked up by the Contractor and removed from the site. Debris and <br />litter that shall be cleaned includes, but is not limited to, leaves, twigs, branches, <br />trash, sand gravel, and worn asphalt. The City shall approve any equipment that <br />is to be used for cleaning hardscape. <br />b) Picnic facilities and park benches, including but not limited to picnic tables, <br />barbecues, benches, concrete pads and shelters shall be continuously maintained <br />in a safe and clean condition. <br />c) Pavement cleaning -Contractor shall perform pressure washing monthly to <br />remove dirt, stains, gum, tar, etc. from all paved pedestrian surfaces including <br />sport courts, sidewalks, picnic pads, paved areas around buildings, pedestrian <br />crosswalks in streets that are concrete or pavers, etc. <br />d) Site amenity cleaning -Contractor shall perform pressure washing of site <br />amenities, such as but not limited to, picnic tables, park benches, skate park, <br />walls, planters, raised curbing, railing, exterior of buildings, overhead shelters, <br />etc. <br />(1) All picnic amenities (picnic tables, b.b.q.s, picnic shelters, concrete picnic <br />pads, etc.) and park benches shall be cleaned every day Monday through <br />Sunday to assure that all trash, stains, spills, debris, glass, staples, nails, <br />tape, wire, etc. is removed. <br />Za <br />25C-200 <br />