|
excessive over spray/runoff into street right-of--ways or other areas not
<br />intended to receive irrigation is controlled. The Contractor shall repair at
<br />his own expense any irrigation head and lateral line rendered inoperable or
<br />malfunctioning due to attrition vandalism, etc.
<br />(2) Contractor shall perform a visual inspection of all irrigated areas once per
<br />week. All areas receiving marginal coverage shall receive supplemental
<br />irrigation by being irrigated by a portable irrigation method. The
<br />contractor shall furnish al( portable hoses, nozzles, sprinklers, etc.,
<br />necessary to accomplish this additional irrigation. Care shall be exercised
<br />to prevent a waste of water, erosion, and/or detrimental seepage into
<br />existing underground improvements or structures.
<br />e) Repairs
<br />The Contractor shall be responsible for repairs to all irrigation heads, swing
<br />joints and lateral lines as a part of this a~~reement. The Director will be
<br />responsible for repairs to the irri~~~~tii~n s~~stcm li~on~ the v~llvc t~~ the ~~~~tcr mct~r.
<br />~). Flardscanc Maintenance
<br />a) All paved areas, including but not limited to paved parking lots. curb gutters..
<br />pool decks, stamped or other enriched hard surface areas, shall be thoroughly
<br />cleaned once a week between Monday and Friday. Vacuums, blowers,
<br />sweepers or other approved equipment may be used to clean hardscape areas.
<br />Debris shall not be blown or swept onto adjacent streets or property. All debris
<br />must be picked up by the Contractor and removed from the site. Debris and
<br />litter that shall be cleaned includes, but is not limited to, leaves, twigs, branches,
<br />trash, sand gravel, and worn asphalt. The City shall approve any equipment that
<br />is to be used for cleaning hardscape.
<br />b) Picnic facilities and park benches, including but not limited to picnic tables,
<br />barbecues, benches, concrete pads and shelters shall be continuously maintained
<br />in a safe and clean condition.
<br />c) Pavement cleaning -Contractor shall perform pressure washing monthly to
<br />remove dirt, stains, gum, tar, etc. from all paved pedestrian surfaces including
<br />sport courts, sidewalks, picnic pads, paved areas around buildings, pedestrian
<br />crosswalks in streets that are concrete or pavers, etc.
<br />d) Site amenity cleaning -Contractor shall perform pressure washing of site
<br />amenities, such as but not limited to, picnic tables, park benches, skate park,
<br />walls, planters, raised curbing, railing, exterior of buildings, overhead shelters,
<br />etc.
<br />(1) All picnic amenities (picnic tables, b.b.q.s, picnic shelters, concrete picnic
<br />pads, etc.) and park benches shall be cleaned every day Monday through
<br />Sunday to assure that all trash, stains, spills, debris, glass, staples, nails,
<br />tape, wire, etc. is removed.
<br />Za
<br />25C-200
<br />
|