Laserfiche WebLink
During inclement weather the Contractor shall work to reopen baseball fields as <br />soon as possible. The Contractor shall use Diamond Dry or an approved equal <br />to warning tracts and fence lines. In addition, the Contractor shall use hand <br />pumps or any other reasonable method necessary to drain water off the field. <br />12. Soccer /Football Field Maintenance <br />a) All soccer/football fields shall be inspected every day, Monday through Friday. <br />Contractor shall look for divots, depressions, debris, and other turf marring <br />conditions. If discovered, the Contractor shall fill in divots and depressions <br />with #20 white silica sand mixed with LaPrima XD Bermuda grass seed during <br />the spring/summer and Stovers Grand Slam perennial rye grass seed during the <br />fall winter to re-establish the areas. <br />b) Areas of the field where turf has been worn away due to play shall be raked, <br />dragged and leveled each day to provide alevel-playing surface free of divots, <br />depressions and uneven surfaces. The Conh~actor shall add approved topsoil to <br />thcsc arias as neccsan~ to I:crp the ar~.~s I~v~l and ,~~~~. <br />C~ ~~11nUa~~V'. the COntf~lClol' Sha~~ top dl'CSS UUl11C~C~ tlll'1 LISIn~.; l~~~U~ln~l~~a ~~llll<l i~n;t <br />mix or approved product Apply with an approved top dressing machine that <br />will achieve a level playing surface. <br />d) The Dan Young Soccer Complex and Santa Ana Stadium Field Synthetic Turf <br />sport turf maintenance and inspection. The field shall be maintained daily <br />Monday through Friday per the Synthetic Turf Maintenance Specifications (see <br />Attachment 4). Maintenance will include grooming and cleaning the field using <br />grooming equipment provided by the City. The field shall be inspected every <br />day Monday through Friday. Contractor shall remove all debris from the field <br />upon discovery. <br />13. Sport Court Maintenance <br />a) All sport courts shall be blown off daily. Courts and fence lines shall be <br />completely free of dirt, debris, etc. <br />b) All sport Courts shall be washed down every other week to remove dust, gum <br />and stains. The courts shall have water removed immediately following the <br />washing down. <br />c) Contractor shall replace tennis and basketball nets when they become worn. <br />The City shall furnish nets. <br />14. General Maintenance and Clean-up For A11 Parks and Contracted Sites <br />a) All trash and debris on the ground or in trash receptacles shall be removed from <br />all worksites each day Monday through Sunday before 12:00 p.m. This includes <br />all landscape areas, paved areas, street curb gutters, flood control channels, etc. <br />2~ <br />25C-203 <br />