My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-05-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/18/2009
>
FULL PACKET_2009-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:19:53 PM
Creation date
5/13/2009 4:06:29 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/18/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a) Local Office <br />The Contractor shall maintain a physical office within the 714 area code (local <br />office). The local office shall be open Monday through Friday 8:00 a.m. to 5:00 <br />p.m. with a company representative present at all times. Answering services or <br />mobile telephones will not be considered a local office. <br />b) Submittals <br />Prior to performing, Contractor shall submit to the Director for approval: 1) a <br />detailed annual, monthly and weekly work schedule; 2) time sheets of <br />employees assigned to the contract areas; 3) names and titles of all persons <br />working on the project and their qualifications; 4) and equipment, materials <br />and/or chemicals to be used on the project. The information contained in the <br />above referenced documents shall be updated with any new information as <br />available. The Director shall be immediately notified of any changes to the <br />above information. <br />c) Uniforms and Vehicle Identification <br />The Contractor shall provide to all field personnel a standard uniform including <br />but not limited to uniform company hats, collared work shirts, pants, jackets, <br />vests and ANSI approved safety shoes. All uniforms will be marked with some <br />form of company logo or other form of identification. <br />All vehicles and equipment on the project site shall be in operable and working <br />condition, clean appearance without visible damage, dirt graffiti etc. In <br />addition, all vehicles shall have the company's name clearly identified on the <br />right and left side doors. <br />B. SAFETY REQUIREMENTS <br />All work performed under this contract shall be completed with maximum safety as the <br />priority above all other requirements. In the event unsafe work is observed by City staff or <br />otherwise reported, the Director may at his discretion order Contractor to stop performing <br />and pay all costs and or damages resulting from the delay. <br />C. SAFETY NOTIFICATION <br />If Contractor identifies a potential safety issue, Contractor shall: <br />1. Notify the public that potentially unsafe conditions exist by installing yellow "Caution <br />Tape" and "A" frame barricades or equal substitute around the condition. <br />2. Notify the Director of the condition first by phone and then in writing (e-mail is <br />acceptable) including digital photographs of the potential safety concern if possible. <br />Once the Contractor has notified the City and the public of the condition, as specified <br />above, Contractor shall have no further responsibility regarding the condition. <br />8 <br />25C-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.