My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-05-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/18/2009
>
FULL PACKET_2009-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:19:53 PM
Creation date
5/13/2009 4:06:29 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/18/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. UNDERGROUND ALERT SYSTEM <br />Underground Alert Systems (telephone number I -800-422-4133) must be notified 48-hours <br />in advance prior to any excavation work. . <br />E. PROPERTY DAMAGE <br />Any damage to private property caused by Contractor shall be immediately reported to the <br />property owner. Contractors shall pay for any damage caused to private property in <br />performing this agreement. <br />F. ACCESS TO PRIVATE PROPERTY <br />Prior to any work involving private property, the Contractor shall notify the City of the <br />proposed work and obtain all necessary permits and/or consent required from City and/or <br />property owner. <br />G. PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS <br />The Contractor shall protect City and/or private property adjacent to work areas including <br />sprinkler systems, drain pipes, lawns, brick work, plantings, masonry work, fences, walls, <br />sidewalks, street paving, etc., located on either public or private property. Contractor shall, <br />at its expense, replace any property that is removed or damaged, other than property pre- <br />approved for removal. <br />TRAFFIC CONTROL <br />The Contractor will not interrupt traffic flow on City streets. In situations where it is <br />necessary to restrict traffic flow, the Contractor will contact the appropriate City <br />department and obtain all necessary permits and/or consent from the responsible public <br />agency. <br />H. MONTHLY REPORTS <br />Prior to the first day of each month the Contractor shall submit the following reports: 1) <br />employees daily work schedule by location and crew/task(s); 2) pesticide use report that <br />was forwarded to the Agricultural Commissioner's Office; 3) irrigation report; and, 4) <br />"green waste" recycling report. <br />I. WATER COST <br />City will pay for water used by Contractor pursuant to this agreement up to a specified <br />amount detailed in a monthly Estimated Applied Water (EA W) report (see Attachment 6). <br />Should the amount of water applied exceed the monthly EAW then the Contractor shall pay <br />the cost of the excess water. <br />II. GROUNDS/LANDSCAPE MAINTENANCE SPECIFICATIONS <br />9 <br />25C-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.