Laserfiche WebLink
32. Pursuant to state law, prior to issuance of a certificate of a use and <br />occupancy permit, the project proponent shall provide evidence to the City <br />of Santa Ana that a Notice of Airport in the vicinity has been recorded on <br />the deed for each residential unit and shall remain so recorded so as long <br />as the airport is in operation. <br />33. As required by the AELUP, prior to issuance of the certificate of use and <br />occupancy, the City shall ensure that the sales office for the residential <br />unit posts a conspicuous sign informing potential buyers to the presence <br />of the airport. The notice shall be in the same language as the need <br />notice. <br />34. Prior to the issuance of a building permit, the project developer shall <br />provide evidence to the Planning Manager that an FAA "NO Hazard" <br />determination has been secured for the operation of the construction <br />cranes. The project developer shall demonstrate compliance with any <br />conditions imposed by the FAA. <br />35. During construction, the contractor shall be required to comply with <br />SCAQMD Fugitive Dust Rule 403 to suppress dust generated by <br />construction operations. To ensure compliance with SCAQMD Fugitive <br />Dust Rule 403, grading plans and demolition plans for the proposed <br />project shall reflect the following notes: <br />• All materials excavated or graded shall be sufficiently watered to prevent <br />excessive amounts of dust. Watering with complete coverage shall <br />occur at least twice daily, once in the late morning and once after work is <br />done for the day. <br />• All clearing and earthwork activities shall cease during periods of high <br />winds (winds greater than 25 mph averaged over one hour) or during <br />Stage 1 or Stage 2 smog episodes. <br />• Internal roadways and project site entry and exit points shall be cleaned <br />at the end of each day by the project developer. Dust and debris from <br />construction activities that migrates or is carried onto MacArthur <br />Boulevard or Main Street adjacent to the project site shall also be <br />cleaned each day. <br />• Alt material transported off-site shall either be sufficiently watered or <br />securely covered to prevent excessive amounts of dust. Haul trucks <br />leaving the site shall have a minimum freeboard distance of 12-inches. <br />• Construction equipment leaving the project site shall be wheel washed. <br />Resolution No. 2009-021 <br />Page 10 of 20 <br />