My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-021 - Conditional Use Permit No. 2005-15 as Conditioned for the Properties Located at 100-130 East Macarthur Boulevard
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2009
>
2009-021 - Conditional Use Permit No. 2005-15 as Conditioned for the Properties Located at 100-130 East Macarthur Boulevard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:25:52 PM
Creation date
5/14/2009 11:53:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2009-021
Date
5/4/2009
Destruction Year
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The amount of area disturbed by clearing and earthwork activities shall <br />be minimized at all times. <br />• Equipment engines shall be maintained in good condition and in proper <br />tune according manufacturer's specifications. <br />• To the extent feasible, construction equipment shall use alternative <br />clean fuels such as compressed natural gas equipment with oxidation <br />catalysts. If alternative clean fuels are not feasible, gasoline powered <br />construction equipment shall be used. <br />• Construction equipment operating on diesel fuel shall use particulate <br />filters or low sulfur diesel. <br />• To the extent feasible construction operations shall use electricity from <br />power poles in-lieu of temporary diesel or gasoline-powered <br />generators. <br />36. Prior to commencement of construction activities, the project developer shall <br />identify to the City a construction relations officer to act as a community <br />liaison concerning on-site activity, including resolution of issues related to <br />dust generation from grading/paving activities. A publicly visible sign shall <br />be posted with the name of construction relations officer and a telephone <br />number. <br />37. During finish work, the construction contractor shall ensure the minimization <br />of ROG emissions. Building plans for the project shall specify and require <br />the use of pre-coated building materials, use of high pressure-low volume <br />(HPL~ paint applicators with 50 percent efficiency, and use of lower <br />volatility paint not to exceed 100 grams of ROG per liter. <br />38. During construction and grading activities, the developer's construction <br />contractor shall comply with the measures set forth in the Storm Water <br />Pollution Prevention Plan (SWPPP) to ensure that airborne dust is kept to a <br />minimum. <br />39. Prior to issuance of building permits and to the extent feasible, building plans <br />for the proposed project shall reflect the use of the following measures. <br />• Use low-polluting high energy-efficient appliances <br />• Install solar panels on roofs to supply electricity for heating and cooling <br />• Use double-paned windows to reduce thermal loss <br />• Install automatic lighting on/off controls and energy-efficient lighting <br />• Use light colored roofing materials in new construction to deflect heat <br />away from buildings. <br />Resolution No. 2009-021 <br />Page 11 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.