My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-025 - Final Environmental Impact Report No. 2004-02
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2009
>
2009-025 - Final Environmental Impact Report No. 2004-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:26:00 PM
Creation date
6/18/2009 12:28:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2009-025
Date
5/18/2009
Destruction Year
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Approvals Contemplated <br />• 1 the Ci of Santa Ana Plannin Commission and the Ci <br />The Addendum will require approva by ty g ty <br />Council. In taking action on the Addendum the City, as Lead Agency, must consider the whole of the <br />data presented in the MacArthur Place South Final EIR and this Addendum to the EIR. The proposed <br />hotel will undergo site plan review and will require a limited ABC license for a beer and wine bar <br />and special event activities. <br />Future Requirement for Determination of No Hazard <br />The relocation of the previously approved Cinema Tower will require a new request to the Federal <br />Aviation Administration (FAA) for a determination of No Hazard to Air Navigation. A <br />Determination of No Hazard is issued by the FAA if it is determined that the proposed project does <br />not have a substantial physical or electromagnetic interference effect upon navigable airspace or air <br />navigation facilities. <br />The original FAA Determination was issued on September 1, 2004 and expired on March 1, 2006. <br />The Determination was based on a building location (33° 41' 55.807" latitude; 117° 51' 57.727" <br />longitude) in approximately the same footprint as now proposed. Subsequent to the first <br />Determination, the project proponent relocated the building 174' to the north (33° 41' 57.496" <br />latitude; 117° 51' 57.701" longitude) and applied for a No Hazard Determination based on that <br />location. In May 2005, the FAA issued four Determinations of No Hazard for the four corners of the <br />relocated building. The Determinations expired on November 8, 2006. A new request will be <br />submitted to the FAA once a construction schedule has been established for the Cinema Tower. <br />• On February 17, 2005 the Airport Land Use Commission (ALUC) chose to treat the absence of the <br />Determination of No Hazard as an impairment of their review and voted that the project was not <br />consistent with AELUP. At a June 16, 2005 meeting, the ALUC staff requested and the Commission <br />agreed to find the project conditionally consistent with the AELUP and incorporated the new FAA <br />Determinations into its decision. <br />In June 2005, when the EIR was certified, the City of Santa Ana was inconsistent with respect to the <br />AELUP for John Wayne Airport. On December 18, 2008, the ALUC approved the City's General <br />Plan Airport Environs Element and deemed the City consistent. <br />• <br />MacArthur Place South <br />EIR Addendum <br />Resolution No. 2009-025 <br />Page 25 of 95 <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.