My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-025 - Final Environmental Impact Report No. 2004-02
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2009
>
2009-025 - Final Environmental Impact Report No. 2004-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:26:00 PM
Creation date
6/18/2009 12:28:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2009-025
Date
5/18/2009
Destruction Year
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Updated Sewer Demand <br /> Increase in Sewer Demand <br /> from the Proposed Project <br />Wastewater Demand Gallons per Day (gallons per day) <br />Previous wastewater demand 282,608 <br />(per EIR) <br /> <br />Reduction in sewer demand from <br />-6,154 304,204 <br />-282 <br />608 <br />removed project components , <br />21,596 <br />Additional sewer demand from +27,750 <br />185-room hotel <br />Total updated sewer demand 304,204 <br />As detailed in the table above, the reduction in sewer demand from the removed project components, <br />plus the addition in sewer demand from the proposed hotel, result in an updated sewer demand of <br />304,204 gallons per day. The proposed project will increase the sewer demand by 21,596 gallons per <br />day compared to the previous project. <br />The City has indicated that the proposed hotel project sewer discharge need will be addressed by a new <br />12" sewer main, which has recently been constructed. As detailed in the Domestic Sewer Technical <br />Report for MacArthur Place, a 12" line has a flow rate of 0.405 million gallons per day (MGD). The <br />project, as addended, would result in a sewer demand of 304,204 gallons a day, which is less than <br />.0405 million gallons per day capacity. The project will have no new or more severe impacts beyond <br />those addressed and mitigated in the EIR. <br />c) Require or result in the construction of new storm water drainage facilities or expansion of existing <br />• facilities, the construction of which could cause significant environmental effects? (No Substantial <br />Change from Previous Analysis) <br />As detailed in the EIR, the previous project was to be entirely developed with impermeable surfaces. <br />The proposed project will also be entirely developed with impermeable surfaces. Thus, no adverse <br />impact on the existing storm water drainage facilities is anticipated because the project as proposed <br />will not significantly differ in terms of runoff from the project analyzed in the EIR. The project will <br />have no new or more severe impacts beyond those addressed and mitigated in the EIR. <br />d) Have sufficient water supplies available to serve the project from existing entitlements and resources <br />or are new or expanded entitlements needed? (No Substantial Change from Previous Analysis) <br />Mitigation Measures were designed to minimize potential impacts to utilities and service systems. The <br />project will have no new or more severe impacts beyond those addressed and mitigated in the EIR. As <br />detailed in the EIR, the City of Santa Ana Water Department provides water service to the MacArthur <br />Place South project area. <br />The data from the Walden and Associates Domestic Water Technical Report for MacArthur Place <br />(Amendment No. 1) dated March 3, 2004 and Amended November 19, 2004 was utilized to calculate <br />the proposed project impacts on water demand. The following components will not be a part of the <br />proposed project: retail, restaurant, and commerciaUresidential components of the Cinema lofts. The <br />water demand calculation for those uses is detailed below. As identified in the table below, the land <br />uses eliminated will result in a reduction in water demand of 7,504 gallons per day. <br />• Resolution No. 2009-025 <br />Page 47 of 95 <br />MacArthur Place South <br />EIR Addendum <br />49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.